Title Page
-
Address:
-
G Net Reference Number:
-
Conducted on
-
Prepared by
-
Location of DP
-
Location of Fibre input?
-
What type of input is it?
-
Is there in coming fibres present?
-
Photo of input.
-
Length of fibres required from input location to DP?
-
No of Fibres required.
-
Fibres required as job pack (Description).
Sign Off
-
Engineer signature