Information
-
Document No.
-
Housekeeping improvement notice for 7-10 Hanover Square, London, W1S 1HQ, United Kingdom
-
Conducted on
-
Prepared by
7-10 Hanover Square, London, W1S 1HQ, United Kingdom
-
7-10 Hanover Square, London, W1S 1HQ, United Kingdom
-
Como project reference: 33245
Notice issued by Como
Contractor notice is issued to
-
Contractor issued to
- Gratte Brothers:6000/MEP
- Celtic Contracts:3800/Dry lining & Ceilings
- Optima:3851/Glazed partitioning
- Accordial:3845/Sliding & folding partitions
- Kingspan:4100/Raised floors
- PPC:4300/Stone & tiling
- Loughton Contracts:4325/Soft flooring
- James Johnson:4445 & 4446/Joinery
- Custom Crafted (Fireclad):4550/Balustrade
- Cornish Concrete:4563/Concrete staircase
- E. Poole:4950/Decorations
- Soltech:5700/Blinds
- Unicable:7200/Voice & data
-
Representative issued to
- cpaladino@gratte.com (M)
- cpaladino@gratte.com (E)
- jimmy.thercaj@celticcontracts.co.uk
- matthew.lawrence@optima-group.co.uk
- benmaher@accordial.co.uk
- steve.hook@kingspanaccessfloors.co.uk
- peter@ppctiling.com
- rjeffrey@loughtoncontracts.com
- ian.silk@james-johnson.co.u
- dominic@customcrafted.com
- David@cornishconcrete.co.uk
- wayne@epoole.co.uk
- rod.slattery@soltech.uk.com
- lawrence@unicable.co.uk
Contractual Obligation
-
We remind you of your contractual obligation to keep your work area clear of rubbish, materials ect to ensure safe and sufficient working of this contract. To comply with this obligation you are requested to immediately remove your rubbish ect from the following areas and place it in containers provided
Health & Safety Risk
-
In the event of rubbish, materials ect from the above mentioned contractor poses a health & safety risk area will immediately be cleared by Leaner Logistics Limited and the relevant charges will be passed on (Examples of such instances are blocked staircases, blocked fire exit routes ect)
-
Do the items pose an immediate health & safety risk?
Location, photos and details of areas that require improvement
-
Level
- Level B1
- Ground
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- Roof
-
Elevation
- North
- South
- East
- West
-
Location
- Male Wc
- Female Wc
- Dis Wc
- Teapoint
- Office
- Open plan
- Corridor
- Staircase
- Balcony
- Corridor
- NOT LISTED
-
Location not listed above
-
Pictures
-
Category
- Housekeeping
- Storage toolboxes
- Material storage
- Damage
- Protection
- H&S
- NOT LISTED
-
Details if not listed above
Time frame given to complete improvement notice
-
If you fail to comply with this notice within "selected timeframe below" others will remove it and you will be charged the full cost of the removal operation. Mace will not be held responsible for any damages caused during the cleanup operation
-
Time Frame
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 hours
- 8 Hours
- 12 Hours
- 24 Hours
- 36 hours
- Close of business
Contra Charge Estimate
-
Estimated time and labour required to complete the "improvement notice" should the selected contractor fail to comply with the issued "improvement notice" (This will be used for the contra charge - Minimum charge of 1 hour will apply to each of the selected trades)
-
Labour Required
- Logistics Manager
- Labourer x 1
- Labourer x 2
- Labourer x 3
- Labourer x 4
- Labourer x 5
- Labourer x 6
- Labourer x 7
- Labourer x 8
- Labourer x 9
- Labourer x 10
- Welfare
- Lift driver
- Forklift driver
- Carpenter
- Ganger
- Scissor Lift Driver
-
Time Required
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 Hours
- 7 Hours
- 8 Hours
- 9 Hours
- 10 Hours
Confirmation of action
-
Add signature
-
Please note: Failure to comply with this notice with this section "signed off" will result in costs still being charged
Signatures
-
Contractor's Company name
-
Name of signee