Site conducted
-
Conducted on
-
Prepared by
-
Work Location
-
DDS Division
General
-
Nearest Intersection/Landmark
-
Nearest Hospital (Optional):
-
Work Tasks
-
Operator Qualifications Verified for Work Tasks
-
Comments:
Required PPE / Safety Equipment
-
Select applicable
- Hard Hat, Safety Glasses, Work Boots
- Safety Vest / Class 3 Hi-Vis Clothing
- Dust Mask
- Hearing Protection
- FR Coverall / 100% Cotton Undergarment
- Air Respirator/ FR Balaclava / FR Glove Liners
- Electric Hazard Rated Rubber Gloves
- Fire Extinguisher
- Other
-
Specify
Pre-Work Assessment
-
Valid Work Permit:
-
Emergency Permit in Process
-
Approved SOP:
-
Within 200' of Reg Station:
-
If "Yes" contact Gas Control
-
Valid Dig Safe/One Call Ticket:
-
Dig Safe Pre-Marks Present:
-
CAT Used Identify UG Electric:
-
CGI Calibrated:
-
Cell Phone Coverage:
Hazard Categories and Preventative Measures
-
Pipeline Safety Over-Pressurization, Gas Leak / Damage, CI Main Break, Undermine, Poor Pressure, Water in Gas Facility, Deep Gas Facility
- Establish "Safety Perimeter"
- Close Roadways / Sidewalks
- Excavate Remote Openings
- Request Environmental Support
- Utilize Air Respirators
- Evacuate Buildings
- Install / Monitor Gauges
- Take Gas Readings
- Davit Retrieval System
- Contact Gas Control
- Utilize Shoring
- Other
-
Specify
-
Weather Conditions Rain, Sleet, Snow, Wind, Fog, Thunderstorms, High Temp, Low Temp, Flooding, Mud
- Slip Resistant Footwear/Spikes
- Slippery Surface Walking Techniques
- Sand / Salt Work Zone
- Water Pumps
- Proper Hydration
- Tent
- Periodic Work Breaks
- Other:
-
Specify
-
Traffic Hazards Heavy Vehicular Traffic, High Speed Vehicles, Commercial Vehicles, Pedestrian Volume, Proximity to School / Businesses
- Signage
- Cones & Barricades
- Vehicle as Barrier
- Pedestrian Walkway
- Flag Person(s)
- Police Detail
- Radar Speed Sign
- LED Road Flares
- Arrow Board
- Jobsite Lighting
- Other: Kids going to bus stop, local traffic in and out of driveways
-
Specify
-
Jobsite Hazards Fire, Water Main Break, Undermine, Active Construction, Tripping Hazards, Traffic Plates, Material Storage, Debris, Environmental Concerns, Noisy, Dark
- Establish Incident Command with FD/PD
- Identify / Eliminate Tripping Hazards
- Hazardous Atmosphere Testing
- A Traffic Plates Stored / Handled Properly
- Close Roads/Sidewalk
- Fall Protection
- Equipment, Tools & Material Stored Properly
- Hearing Protection
- Jobsite Lighting
- Other:
-
Specify
-
Other Utility Assets OH/UG Electric, Cable, Telephone, Water, Sewer, Cesspool, Sprinklers
- Hand Excavate within Tolerance Zone
- Utilize CAT to locate UG Electric
- Insulating Blankets
- Verify Markout
- Request De-energization
- Rubber Gloves
- Other:
- Overhead lines
-
Specify
-
Heavy Equip / Tools / Rigging Backhoe, Loader, Trencher, Skid Steer, Dig-It, Crane, Dump Truck, HDD, Road Saw, Pneumatic Equip.
- Backup Alarm Functional
- Swing Radius Review
- Utilize Spotter
- Blind Spot Awareness
- Hand Signals Confirmed
- Inspect Rigging Equipment
- Verify Sufficient Load Capacity of Lifting Equipment
- Stabilizers Up When Moving
- Establish Drop Zone
- Other:
-
Specify
-
Vehicle Backing, Damage by Public Vehicles, Vehicle Security, Entering / Exiting Risks
- Spotter for Backing & Tight Maneuvers
- Lock Vehicles Outside Work Zone
- Parking Brake
- Utilize 3 Points of Contact
- Safe Parking Locations
- Monitor Vehicle Within Work Zone
- Wheel Chocks
- Remove Keys
- Other:
-
Specify
-
Soft Tissue Injury Prevention Sprain, Strain, Contusion, Laceration, Abrasion
- Co-worker/Mechanical Lift Assist
- Stretch & Flex
- Identify Pinch Points/Sharp Edges
- 3 points of contact
- Proper Body Position
- Other:
-
Specify
-
Other Hazards & Risks Complacency, Distraction, Fatigue Time Constraints, Personal Safety / Security, Animals, Insects, etc.
- Maintain Situational Awareness
- First Aid Kit Available
- Effective Communication
- Burn Kit Available
- Safety Stop / Time Out
- Other
-
Specify
Excavation
-
All excavations are to be evaluated by a the competent person at least once per day, prior to entry, and as needed throughout the shift
-
Competent Person
-
Comments
Excavation
-
Dimensions
-
Length___FT___IN
-
Width___FT___IN
-
Depth___FT___IN
-
Soil Classification
-
Protective System Required
-
Supervisor Notified at
-
Select
-
Specify
-
Notes
- Surface Water present
- Excavation exposed to vibration
- Previously disturbed soils
- Excavation contains layered soils
- Adjacent Structures
- Excavation Access / Egress Compliance-Ladders / Steps / Ramps
- Design of protective system available at jobsite
-
Estimate depth based on prints & update prior to entry if needed The excavation depth must be measured from the deepest point. Excavations 5 feet or greater require a protective system unless within stable rock.
-
Soil classifications: Each soil and rock deposit shall be classified by a competent person as Stable Rock, Type A, Type B, or Type C using OSHA approved visual and manual tests. If after classifying a deposit, the properties, factors, or conditions affecting its classification change in any way, the changes shall be evaluated by a competent person. The deposit shall be reclassified as necessary to reflect the changed circumstances.
Means of Egress: Ladders or other safe means of egress shall be provided in excavations 4' or greater and (1) per 25' lateral travel for employees. Ladders used in excavations secured and extended 3' above landing or grade level.
Soil Setback: Soil and materials must be maintained 24" from the edge of the excavation.
Job Brief Participation
-
Participant
-
Name and Signature
-
Position
-
Time initial job brief completed
-
Crew Leader's signature
-
Job Brief reviewed with other crews if present
Job Brief Re-assessment
-
Must be completed lunch/significant delay or when job tasks/jobsite conditions/hazards have changed
-
Re-assessment conducted by
-
Changes to hazards or required preventive measures
-
Supervisor Review