Information

  • Gate 4 Drilling Operations (Rig Up)

  • Conducted on

  • Document No.

  • Prepared by

Site Information

  • Spill kits and fire extinguisher available, complete and in date

  • Notify drill operator so test and tag can be completed

  • Rig nappy and other liners in leak / spill risk areas in place and fit for purpose

  • Photo

  • Notify drill operator

  • Sumps constructed per design parameters. Diamond hole in ground sumps lined with water level at least 20cm below lowest edge

  • Photo of non compliance

  • Rubbish bag available and removed/replaced regularly

  • Notify drill operator of requirements regarding waste

  • Hydrocarbon and chemicals correctly bunded. Spills responsibly managed

  • Photo of issue

  • Sediment control integrity checked and fit for purpose

  • Notify field supervisor so repairs to sediment controls can be scheduled

  • General site photo

  • Name and Signature of person completing checklist

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.