Title Page

  • Site conducted

  • Client / Site

  • Contractors Name if Applicable.

  • Conducted on

  • Prepared by

  • Location
  • Personnel on Site Names

ORGANISATION

  • Updated copy of the OHS Act

  • Letter of Good Standing

  • Notification of Construction Work

  • 37(2) Agreement

  • Site Start up Checklist

  • Health and Safety Plan

  • Policies (Safety/Environmental)

  • Organogramme

  • Appointments

  • List of Sub-Contractors

  • Emergency numbers

  • Fall Protection plan

  • Applicable Registers

  • Health & Safety committee members

  • Health & Safety Representatives inspection checklist

  • Health & Safety meetings

  • Recording of investigation of incidents

  • Annexure 1

  • WCL 2

  • Material Safety Data Sheets

  • Safe Work Procedures

  • Toolbox talks: Topics

  • Toolbox talks: Record of Attendance

  • Toolbox talks: Participation

  • Induction Training

  • Employee Medicals Available

  • Professionals/Management Induction Training

  • Risk Assessments

  • SMI Board/ Notice board

  • OHS Act Regulations Poster

  • Other Safety Posters

  • Employment Equity Act Posters

  • Certification of Lifting Equipment

  • Site Establishment/Security

  • Construction Vehicles Parking areas

FIRST AID

  • First aider certificate valid and appointed in writing

  • Sufficient first aid boxes supplied

  • Minimum Required Contents

  • Adequate signage indicating position of first aid box

  • Name of certified first aider displayed

  • First aid register/Dressing Record

  • First aid box accessible

FIRE FIGHTING EQUIPMENT

  • Emergency preparedness

  • Correct type of Fire Extinguishers

  • Sufficient fire fighting equipment

  • Demarcation

  • Equipment inspected

  • Personnel trained to use & inspect & appointed in writing

  • Symbolic signs placed & maintained

PERSONAL PROTECTIVE EQUIPMENT

  • PPE Agreements Signed and Explained

  • Employees taught to use and maintain the PPE supplied

  • PPE Register

  • Records of PPE Exchanged

  • PPE Worn correctly on site

SIGNAGE

  • Sufficient Symbolic Safety Signs to adequately highlight dangers in area

  • Suitable placement of symbolic safety signs in use

  • Colour coding

  • Personnel conversant with the meaning of the symbolic safety signs in use

  • People conversant with the colour code in use

HOUSEKEEPING

  • Site Clean – neat & tidy

  • Spillages

  • Waste Management

  • Waste bins regularly emptied

STACKING & STORAGE

  • Stacking supervised by a competent person

  • Free stackings 3X min base size

  • Surface on which stack is built is stable and capable of supporting weight of stack

  • Lower articles can take the weight

  • Pallets and containers in good condition

  • Support structure sound

  • Any endangered machinery, electricity or other

  • Stack not a fire hazard

  • Stacking and storage to standard and supervised by competent person appointed in writing

EXCAVATIONS

  • Valid appointment of Excavation Supervisor/Inspector

  • Permit for excavation

  • Pre-shift Inspections

  • Safe access to the excavations

  • Barrication

MOBILE PLANT/CONSTRUCTION VEHICLE

  • Appointment letter and proof of competency

  • Medical certificate of fitness

  • Per- shift Inspections

  • Fire Extinguisher secured and in place

  • PDP/Licence

ELECTRICAL INSTALLATION

  • Appointment letter and proof of competency

  • Inspection (At least once a week)

  • Existing services identified

  • Adequate PPE provided

FACILITIES

  • Eating facilities

  • Drinking water

  • Sanitary facilities

  • Toilet paper, sanitation

  • Additional Info

  • Inspected BY:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.