Title Page

  • EWBE Engineer Name

  • Client / Site

  • Conducted On

  • GENIUS ID

Visual Inspection

  • Take a picture of the GENIUS upon arrival

  • List all current Inputs & Outputs

  • List any visible defects/damage to the unit

  • Take pictures of any defects upon arrival

  • Check the power supply & fused spur

  • List any anomalies

  • Check tablet functionality

Temperature Readings

  • A full temperature sensor check must be undertaken. Please list any discrepancies or calibration requirements below

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

  • List: Sensor Name, Sensor Location, Temp Reading & Actual Reading

Control Points

  • A full temperature sensor check must be undertaken. Please list any discrepancies or calibration requirements below

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

  • List: Controlled Plant/Point, Plant Location & Test Result

Field Wiring

  • Trace field wiring to check for any signs of damage and list any issues

  • List any issues found

Remote Connectivity

  • Is remote connection available to the router?

  • Is GENIUS head end available online?

  • Is GENIUS shortcut available to GM and CE?

  • List all users setup within GENIUS

Further Notes

  • List any potential all areas of expansion or further energy savings

  • List any remedial works to be undertaken

Signing Off

  • Please ensure that a copy of this service document is emailed to the Chief Engineer and returned to the EWBE office. This must be done on day of completion.

  • Signature of Chief Engineer

  • Signature of EWBE engineer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.