Information

  • Conducted on

  • Job Name

  • Job Number

  • GHP Inspector's Name

  • Additional Inspectors

GENERAL SAFETY

  • Work areas and the site neat and orderly, with tripping hazards removed?

  • Select date

  • Trash and debris being placed in proper receptacles?

  • Select date

  • Proper employment and OSHA signage on display?

  • Select date

  • JHAs being performed daily for each task?

  • Select date

  • Storm-water Management Inspections being completed on time and findings corrected in 72 hours?

  • Select date

  • Task-specific signage being used (e.g. Lasers, Powder Actuated Fasteners, Overhead Work, Egress Path, etc.)?

  • Select date

  • First-aid, blood-borne pathogen, eye-wash, & spill kit stocked and available? Water infiltration protection (wip) kit available (where applicable)?

  • Select date

  • Are: 1.) GH Phipps Tool Box/Training Meeting Records, 2.) GH Phipps SDS forms & Policies, 3.) Subcontractor SDS forms & Policies, and 4.) GH Phipps & Subcontractor Haz-Com forms, updated/available/verified for all activities onsite?

  • Select date

  • Fire extinguishers inspected monthly? Designated fire extinguisher(s) located <50’ from flammable/pressurized material storage?

  • Select date

  • Liquids, flammables, and pollutants stored properly in secondary containment/covered? Are “NO SMOKING” signs posted?

  • Select date

  • Impalement hazards (rebar, conduit, pipe, etc) properly protected?

  • Select date

  • Temporary toilet facilities adequate, maintained, secured, and located on impervious surface/catch tray?

  • Select date

  • PPE: Hardhats, boots, pants, 4” sleeves, hi-visibility vests, eye protection (Z.87 with side shields), hearing protection, and gloves in use by all employees? Face shields being used for overhead work? Kevlar sleeves/gloves for sharps/demo work?

  • Select date

  • Overhead hazards protected?

  • Select date

  • Are environmental hazards managed (sun/hot/cold/wet/wind/ice/insects/vermin/asbestos/mercury/silica)?

  • Select date

Slips / Trips / Falls

  • Holes larger than 2” in diameter covered, marked, and secured?

  • Select date

  • Floor openings > 2’ in diameter and wall openings > 19” properly protected (e.g. guardrails, handrails, barricades, and toe boards)?

  • Select date

  • Access/egress and main travel ways free from cords, hoses, mud, ice, and other trip hazards with 3’ clear?

  • Select date

  • Six (6) foot + fall exposures properly tied-off or protected (e.g. guardrails, handrails, barricades, and toe boards)?

  • Select date

  • Barricades, fencing, caution/danger tape, etc, being used properly and maintained?

  • Select date

  • Vertical elevation breaks greater than 19”? Are there steps?

  • Select date

  • Proper fall arrest/protection (lanyards/retractables) in use, including in boom lifts? Inspected as required by manufacturer?

  • Select date

  • Roof flagging 15’ back from leading edge for general activities and 6’ back from roof work maintained?

  • Select date

Ladders

  • Extension ladders extended 3’ above upper landing(s)? Are they securely fastened with a cattle guard at the upper landing(s)?

  • Select date

  • Ladders positioned at 4:1 (rise/run)?

  • Select date

  • Only type 1, 1A, and 1AA ladders in use with all labels legible, and without any damaged/missing parts?

  • Select date

  • Stepladders being used in proper position and employees are not on the top 2 rungs?

  • Select date

Tools

  • Tools in proper working condition, including guards and mag switches (where required)?

  • Select date

  • GFCIs in use for ALL power equipment?

  • Select date

  • Damaged tools and equipment tagged out?

  • Select date

  • Employees trained to operate power tools and carrying certification to operate powder-actuated tools?

  • Select date

Equipment

  • Has equipment been inspected? Backup alarm functioning properly? Seatbelts in use?

  • Select date

  • Operators certified (forklift and crane) and trained (scissors and boom lifts)?

  • Select date

  • Swing radiuses barricaded?

  • Select date

  • Equipment is not left running with an operator more than 25’ away or idling in enclosed spaces? Are CO monitors in place?

  • Select date

Material Handling & Rigging

  • Employees using proper lifting techniques?

  • Select date

  • Chains, straps, and chokers in good condition with legible capacity ratings?

  • Select date

  • Lifting hooks have safety latch in place?

  • Select date

  • Tag-lines being used properly (correct length)?

  • Select date

  • Hoisting equipment being used and stored correctly?

  • Select date

Trenching & Excavating

  • Excavations greater than 5’ deep properly sloped/benched and shored?

  • Select date

  • Excavation contractor’s competent person signed-off on excavation before employees entering?

  • Select date

  • Crew aware of potential existing and overhead utilities?

  • Select date

  • Spoils kept at 2’ away from excavation/trench edge?

  • Select date

  • Open excavations barricaded at perimeter?

  • Select date

  • Adequate egress/exits from trench; not more than 50’ apart?

  • Select date

  • Utility locates have been completed and underground utilities marked?

  • Select date

Scaffolding

  • Mud-sills properly installed? Is scaffolding tied to structure adequately?

  • Select date

  • Is access/egress adequate?

  • Select date

  • Planking properly installed? Top-rail/mid-rail/toe boards in place?

  • Select date

  • Has a competent person signed off before employees are granted access? Is it tagged?

  • Select date

  • Mobile scaffolds (e.g. baker scaffolds) properly erected with outriggers/base plates/casters locked/hand-rails above 6’?

  • Select date

Electrical

  • Extension cords inspected and in good condition with grounding prong?

  • Select date

  • Temporary lighting adequate and are protective cages in place?

  • Select date

  • Is GHP assured grounding colors are up-to-date for tools and cords?

  • Select date

  • Verify no open circuits, panels, cover plates, etc.? Panels and gear have a minimum 36” clearance?

  • Select date

  • Minimum 10’ clearance between equipment and any power lines (scaffolding, cranes, excavators, forklifts, & equipment)?

  • Select date

Welding/Cutting

  • Are hot works permits in place before hot work occurs?

  • Select date

  • Is fire watch occurring 30 minutes after hot work?

  • Select date

  • Is a fire extinguisher immediately available and ready (within 25’)?

  • Select date

  • Proper PPE including hardhat-mounted hood, welding screens, fire blankets, and air monitoring in use?

  • Select date

Confined Space

  • Safety Department contacted to walk potential confined spaces?

  • Select date

  • Evaluation procedures followed and permit in place?

  • Select date

  • Calibrated air monitors (Phipps and Subcontractor’s) in use?

  • Select date

  • Signage in place and access restricted?

  • Select date

Open Observations

GHP Inspector’s Signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.