Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
GHAZIABAD I&C
-
- Type of Connection (Commercial / Industrial) :
-
- Contract Pressure:
-
- Address:
-
- MRS CHECK POINTS
-
WALL MOUNTED
-
MRS SKID
-
LOCATION OF MRS
-
a) Outside the premises
-
b) Just Inside the premises (Inner side of Premises )
-
c) Inside the premises : (Approx. Length of MDPE )
-
Condition of MRS OK / NOT OK
-
Any TAP-OFF point in UPSTREAM of Meter
-
Seal Status of Meter & Regulator
-
By-Pass line closed & Sealed
-
Cage & Lock Status
-
Electrical Installation near MRS
-
Clear Accessibility to MRS
-
Safety Sign boards Availability
-
- IPW AND SAFETY CHECK POINTS
-
IPW Painting/Clamping/Rusting etc. Status
-
IPW Concealed
-
Electrical cables/socket nearby IPW
-
Proper Ventilation available
-
Fire Extinguisher availability
-
- TOTAL NOS. OF EQUIPMENTS/APPLIANCES RUNNING ON NATURAL GAS
-
BURNER
-
OVEN
-
BOILER
-
THERMOSTAT
-
OTHERS
-
- AVAILABILITY/ARRANGEMENT OF ALTERNATE FUEL
-
Name of Alternate Fuel -
-
Remarks
-
- SAFETY OBSERVATION (if any)
-
REMARKS:
-
- NAME:
-
- DESIGNATION:
-
- SIGNATURE:
-
- CUSTOMER
-
- IGL PNG REPRESENTATIVE
-
- FIRE & SAFETY