Information

  • Audit Title

  • Client / Site

  • Location
  • Personnel

  • Conducted on

  • Prepared by

1. Personal Protective Equipment (PPE)

  • 1.1 Lack of, or inadequate PPE (including sun protection)

  • 1.2 Lack of system to issue, inspect, replace and monitor PPE? (Inspection forms, Equipment sign-out sheet)

  • 1.3 Lack of training in safe use, clean-up and inspection of PPE?

  • 1.4 Respiratory protection/equipment?

2. Equipment (chop saws, drills, mixers, pumps, etc.)

  • 2.1 Unsafe or damaged equipment (including missing or damaged guards)

  • 2.2 Incorrect equipment for job? (ex. grinding discs for cutting)

  • 2.3 Incompatible scaffold components? unlabeled or do not meet SAIA standards?

  • 2.4 Unsafe or incompatible attachments used with equipment?

  • 2.5 Unlicensed operators?

  • 2.6 Lack of safe work instructions?

  • 2.7 Lack of LOTO procedures for cleaning, servicing and maintenance?

  • 2.8 Lack of inspection regime?

3. Job Site Specific

  • 3A. Scaffolds on the job? (Rolling, non-rolling)

  • 3A.1 Unsafe or damaged scaffolds (including brakes that will not lock)

  • 3A.2 Uncertified persons erecting scaffold above 6 ft.?

  • 3A.3 Unsafe or incomplete scaffold?

  • 3A.4 Safe Work Load (SWL) exceeded? (tools,stored materials, number of persons)

  • 3A.5 Lack of inspection protocol for scaffold?

  • 3A.6 All wheels locked on rolling scaffolds while in use?

  • 3B. Are we working at a Height greater than 6ft? (shafts, voids, edge)

  • 3B.1 Fall risks (6ft. or more, including voids, pits, and trenches)

  • 3B.2 Lack of edge protection?

  • 3B.3 Unsafe or incomplete edge protection?

  • 3C. Are we using Ladders?

  • 3C.1 Unsafe or damaged ladders?

  • 3C.2 Unsafe positioning of ladders?

  • 3C.3 Ladder not properly secured?

  • 3D. Is Fall Protection required for any site work?

  • 3D.1 Unlabeled or does not meet manufacturers standards?

  • 3D.2 Unsafe or uncertified anchor points?

  • 3D.3 Lack of inspection protocol for equipment?

  • 3D.4 Inadequate training for PFAS?

  • 3D.5 Unsafe or damaged harness or equipment?

  • 3D.6 Incompatible hooks/equipment?

  • 3E. do we have Lifting Equipment on site? (scissor, boom, fork)

  • 3E.1 Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?

  • 3E.2 Lifting equipment unlabeled, does not meet manufacturers recommended standards?

  • 3E.3 Lack of LOTO procedures for cleaning, servicing and maintenance?

  • 3E.4 Lack of SWL information displayed?

  • 3E.5 SWL of any lifting equipment exceeded?

  • 3E.6 Lack of maintenance?

  • 3E.7 Unsafe act?

  • 3E.8 Lack of daily inspections protocol?

  • 3E.9 Unlicensed operators?

  • 3E.10 Loads lifted over persons, close proximity to obstacles incl. overhead power lines?

  • 3F. Are we working in a confined Space?

  • 17.1 Confined space personnel trained and certified?

  • 17.2 All permitted confined space controls in place?

  • 3G. Are there Hazardous Chemicals on site? (including fuel, oil)

  • 3G.1 Lack of emergency procedures for injury/spills/fire/etc.

  • 3G.2 Excessive quantities stored on site or in vehicles?

  • 3G.3 Insufficient Ventilation?

  • 3G.4 Insufficient, or incorrect, PPE?

  • 3G.5 Unsuitable/missing/damaged fire protection (fire extinguisher)

  • 3G.6 Unsafe storage location? (ex. flammables near ignition sources, spills could enter storm water drains, etc)

  • 3G.7 Incompatible chemicals stored near each other?

  • 3G.8 Inadequate spill containment equipment?

  • 3G.9 Safety data sheets not accessible on site?

4. Manual Tasks (hazardous)

  • 4.1 Lack of assessment of hazardous manual tasks?

  • 4.2 Inadequate risk controls? (ex. no job rotation, lighter loads, trolleys, lifting equipment, etc.)

  • 4.3 Lack of training in risk controls and safe lifting/team lifting techniques?

  • 4.4 Lack of identification hazardous manual tasks?

5. Electrical Hazards

  • 5.1 Unsafe electrical leads? (damaged, out of test date or untested)

  • 5.2 Lack of GFCI protection?

  • 5.3 Contact with overhead electrical lines?

  • 5.4 Overloading outlets?

  • 5.5 Electrical equipment near water?

  • 5.6 Electrical equipment near flammables?

6. Work Environment

  • 6.1 Inadequate housekeeping?

  • 6.2 Potentially Hazardous condition?

  • 6.3 Lack of/or inadequate amenities? (Toilets, wash areas, lunch rooms, etc)

  • 6.4 Insufficient lighting?

  • 6.5 Danger area/unsafe act/horseplay?

  • 6.6 Lack of, or inadequate noise/vibration control?

  • 6.7 Striking against-struck by/ergonomics

7. Emergency Response

  • 7.1 Lack of, or no emergency plans for site?

  • 7.2 Emergency procedures not displayed at site?

  • 7.3 Lack of training and rehearsal of emergency plans?

  • 7.4 Lack of, or inadequate first aid kits and equipment for the site?

  • 7.5 Insufficient access to formally trained first aiders for all shifts?

  • 7.6 Unsuitable or inadequate communication equipment?

8. Administrative Procedures

  • 8.1 Lack or/or inadequate Job Hazard Analysis (JHA) for high-risk work?

  • 8.2 Lack of/or inadequate Site Safety Plan?

  • 8.3 Lack of/or inadequate system to review SWP/IIPP as needed?

  • 8.4 Lack of/or inadequate routine inspections, monitoring, audits?

  • 8.5 Lack or/or inadequate training, licenses, skills, experience?

  • 8.6 OSHA posters/permits/workers comp. postings?

9. Fire Protection

  • 9.1 Fire extinguisher within proper distance of spark emitting/hot work operation?

  • 9.2 Fire extinguisher to code and inspected?

  • 9.3 Combustible gasses/flammable stored properly?

10. General Contractor

  • 10. Did you evaluate the General Contractor? (check if yes)

10.1. Environmental Hazards

  • 10.1.1 Lack of/or inadequate Environmental Management Plan (EMP)?

  • 10.1.2 SWPPP

  • 10.1.3 PACM/PLCM- ACM/LCM (Asbestos/Lead)

  • 10.1.4 Lack of/or inadequate, dust suppression system?

10.2. Excavations

  • 10.2.1 Covers/shoring/access/sloping/etc.?

10.3 Traffic Management

  • 10.3.1 Lack of, or inadequate, Traffic Management Plan (TMP) in place?

  • 10.3.2 Lack of training in TMP for all persons on site? (contractors and visitors)

  • 10.3.3 Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)

Comments & Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • Foreman Signature

  • Auditor's Signature Kirk Williamson, Giampolini & Co. Director of Safety

Area Walked

Area Walked for Safety Audit

  • Zone 1

  • Train Platform Level

  • Grid Lines

  • Lower Concourse Level

  • Grid Lines

  • Ground Level

  • Grid Lines

  • Second Level

  • Grid Lines

  • Bus Deck Level

  • Grid Lines

  • Roof Park Level

  • Grid Lines

  • Zone 2

  • Train Platform Level

  • Grid Lines

  • Lower Concourse Level

  • Grid Lines

  • Ground Level

  • Grid Lines

  • Second Level

  • Grid Lines

  • Bus Deck

  • Grid Lines

  • Roof Park Level

  • Grid Lines

  • Zone 3

  • Train Platform Level

  • Grid Lines

  • Lower Concourse Level

  • Grid Lines

  • Ground Level

  • Grid Lines

  • Second Level

  • Grid Lines

  • Bus Deck Level

  • Grid Lines

  • Roof Park Level

  • Grid Lines

  • Zone 4

  • Train Platform Level

  • Grid Lines

  • Lower Concourse Level

  • Grid Lines

  • Ground Level

  • Grid Lines

  • Second Level

  • Grid Lines

  • Bus Deck Level

  • Grid Lines

  • Roof Park Level

  • Grid Lines

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.