Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Officers Name:
-
Support Officer:
-
WHS check completed
Storage Tanks
-
Are the storage tanks clear and have safe access?
-
Water Level in Tanks
-
Number of tanks with water in them.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
Well / Pump Details
-
Were the Wells opened?
-
Pump 1 / LCW 3:
-
Time pump was inspected
-
Pump Box Satisfactory?
-
Pump 2 / LCW 2:
-
Time pump was inspected
-
Pump Box Satisfactory?
-
Pump 3 / LCW 1:
-
Time pump was inspected
-
Pump Box Satisfactory?
-
Are all Alarms ok?
-
Alarm / Camera Comments:
-
Pump & Sump - Leak near Pump 3 / LCW 1
-
Water Level:
Leachate Status:
Geofabric Condition:
Trenches - Water level:
Treatment Cells
-
Is the Main power box secure?
-
Does the box need spraying for pests/bugs?
-
Notes:
-
North Cells Open?
-
South Cells Open?
-
Flow Meter reading:
-
Photo of North Flow meter
-
Photo of South Flow Meter
-
Treatment Pond
-
Treatment Pond TDS: Water Level: Condition of pond: i.e algae/plant levels
-
Is the submersible pumps clear/clean of algae/plants
-
Is the inlet for the mono pump clear/clean of algae/plants
-
Are the pump floats clear/clean of algae/plants
-
Notes:
-
Sewer flow meter
-
Is the Pond enclosure secure and safe/free from pest/bugs
Wetland
-
Is there safe access to/around the wetland, including the outlet cage.
-
Notes:
-
Condition of Wetland Water level TDS: Algae/plant
-
Is the outlet secure with padlock and in closed position?
-
Notes:
-
Temporary Dam - Leak near Pump 2 / LCW 2
-
General site comments: <br>Access/overgrown<br>Status on leak/s<br>Overall site security/integrity of fencing<br>WHS issues/concerns<br>
WHS Comments/Concerns:
-
Southern cell rebuild row 1
-
Southern cell rebuild row 2
-
Southern cell rebuild row 3
-
Southern cell rebuild row 4
-
Northern cell rebuild 1
-
Northern cell rebuild 2
-
Northern call rebuild 3
-
Northern call rebuild 4