Title Page
-
Conducted on
-
Prepared by
- Richard Grice
- Alina Sirenko
- Sarah Darlington
- Melissa Bogle
- Roxanne La Roche
- Ian Ferguson
- Angelika Sum
Sourdough (Bay 1)
DEBOX AREA & CEPI AREA
-
PPE worn correctly
-
Doors in to area from goods in are closed when not in use
-
No foreign body risks (i.e. tools left, cardboard)
-
No cross contamination risks (i.e. previous product)
-
Area Fabrication: Walls, floor and equipment free from damage
-
Drains clean and free from blockages
-
Raw Material pallets are intact with no signs of damage of spillages of raw material
-
Cleaning equipment clean & stored correctly (No Damage to equipment)
-
Traceability labels present on all ingredients
-
Paperwork completed accurately and on time with metal detectable pen is use
-
Scissors being used and stored correctly
-
Framework and machine feet clean
-
Sieves clean and intact
WEIGH UP & SOURDOUGH TANK ROOM
-
PPE worn correctly
-
sammy spinner clean check
-
Raw Material Tubs are clean (check inside and outside), free from excess build up, labelled with correct traceability labels and with lids on when not in use. Labels stored on the tables, no labels stored on the steps .
-
No wooden pallets, paper bags or cardboard in area
-
lids closed on raw material tubs when not in use
-
Scales & QC tables clean with no product debris/build up (check underneath)
-
Sourdough tanks free from build up, Flour chute free from build up, steps clean, surrounding area clean
-
Check Area is free the cobwebs (look above tanks / check cable trunking).
-
The grey floor seal next to the chiller door is free from mould
-
Area fabrication, floors & skirting clean & free from damage
-
Drains clean and free from blockages
-
Cleaning equipment clean & stored correctly (No Damage to equipment)
-
Hygiene stations have running water, stocked hand wash, sanitizer, paper roll
-
Paperwork completed accurately and on time with metal detectable pen is use
-
Cleaning chart completed accurately and on time (For Debox and Tank Room - Located on wall tank room)
-
Company issue probes in use with probe wipes present
-
"Clean as you go" being practiced
-
Spot check ask if the workers are using their own stevens login
-
No foreign body risks (i.e. tools left out, bits of packaging or labels
-
No cross contamination risks (i.e. previous product)
MIXING AREA BAY 1
-
PPE worn correctly
-
QC Desk clean & tidy inside (no product debris, no uncontrolled documents, no tools etc.)
-
Raw Material Tubs are clean (check inside and outside), free from excess build up, labelled with correct traceability labels and with lids on when not in use
-
Mixing bowls clean & free from build up (check between bowl and wheels)
-
Hygiene stations have running water, stocked hand wash, sanitizer, paper roll
-
Framework clean and free from build up
-
Area fabrication, floors & skirting clean & debris free
-
Drains clean and free from blockages
-
Cleaning equipment clean & stored correctly (No Damage to equipment)
-
Paperwork completed accurately and on time with metal detectable pen is use
-
Company issue probes in use with probe wipes present
-
No cross contamination risks (i.e. previous product)
-
No foreign body risks (i.e. tools left in area, overhead areas free from build up)
WASH AREA- Driem Line
-
PPE worn correctly
-
Chemicals locked
-
No hose pipes on the floor
-
Sinks clean & debris free, and free from obstruction
-
Cleaning equipment clean & stored correctly (No Damage to equipment)
-
Correct segregation between dirty & clean areas and equipment (no dirty equipment in "clean area")
-
Area fabrication, floors, & skirting, strip curtains, walls 7 blue air socks clean & free from mould (check high level corners for mould)
-
Drains clean and free from blockages
Production Area, Box Room, Prover & Decoration Street
-
PPE worn correctly
-
Scales & QC tables clean & debris free
-
Raw Material Tubs are clean (check inside and outside), free from excess build up, labelled with correct traceability labels and with lids on when not in use
-
Hygiene stations have running water, stocked hand wash, sanitizer, paper roll
-
Cleaning equipment clean and stored correctly when not in use (No Damage to equipment)
-
Food contact equipment (blue) Stored Correctly
-
Belts are free from damage and stored correctly between runs (eg. Cracks in blue plasic)
-
Area fabrication, framework, floors & walls free from damage
-
Drains clean and free from blockages
-
No foreign body risks (i.e. tools left next to line)
-
No cross contamination risks (i.e. previous product)
-
Russel mobile sieve unit must be at least 1 meter away from the line to prevent accidental damage
-
Company issue probes in use with probe wipes present
-
Line clean from product build up, including underneath
-
Tool boxes kept clean and organised, locked when not in use
-
Paperwork completed accurately and on time with metal detectable pen is use
-
Cleaning chart completed accurately and on time (For Production areas - located on Driem wall line)
-
Inside prover clean and free from product build up
-
All conveyors intact and free from debris build up
-
Catch trays free from product/ debris build up
TRAY & BASKET CLEANING AND STORAGE AREA- Bay 1
-
Tray cleaning vacuum operating correctly
-
Tray cleaning room clean and free from damage
-
Tray / basket store (Robot area) clean and free from build up
-
Stored trays visibly clean
-
No cross contamination risks after clean (i.e. previous product)
-
No foreign body risks after clean (i.e. broken equipment, trays, tools)
-
Area fabrication, framework, floors & walls free from damage
-
Drains clean and free from blockages
OVEN AREA- Bay 1
-
PPE worn correctly
-
Oven infeed and outfeed cleaning completed (8am every morning)
-
Cleaning equipment stored correctly and clean when not in use (No Damage to equipment)
-
Area fabrication, framework, floors & walls free from damage
-
Drains clean and free from blockages
-
No cross contamination risks (i.e. previous product/ seeds when not producing seeded)
-
No foreign body risks (i.e. tools )
-
Paperwork completed accurately and on time with metal detectable pen is use
SPIRAL FREEZER AND PACKING AREA Bay 1
-
PPE worn correctly
-
Doors in to area from dispatch are closed when not in use
-
Cleaning equipment clean & stored correctly when not in use (No Damage to equipment)
-
Area fabrication, floors & skirting clean & debris free
-
Drains clean and free from blockages
-
Paperwork completed accurately and on time with metal detectable pen is use
-
Cleaning chart completed accurately and on time (For all Packing area - Located on whiteboard in cold pack)
-
Inside Spiral freezer clean, free from heavy ice buildup (defrost program done in the morning)
-
Hygiene stations have running water, stocked hand wash, sanitizer, paper roll
-
BVM Packing Machine clean and free from debris
-
Conveyors clean & free from product / seed build up or damage
-
Metal detector checks up to date, correct test pieces in use
-
Metal detector & checks up to date. Check metal detection stick, correct stick in use 3.5mm = Fe 4.0mm = Non Fe 4.5mm = Stainless Steel
-
No foreign body risks (i.e. tools next to line, damaged equipment or debris)
-
No cross contamination risks (i.e. previous product/ seeds when not producing seeded)
-
QC desk clean & debris free (check inside desks, no product, tools or uncontrolled documents / items)
-
Toolbox clean & locked when not in use
-
Check Tool box, list of tools matches the tools in the box (no missing or additional tools)