Title Page

  • Conducted on

  • Prepared by

  • Location
  • Has the fire wall been inspected

  • What was the result of the inspection.

  • Has the rock wool been installed.

Component Check

  • Is there a minimum of 20mm clearance from the shaft liner to the frame

  • Has the J-track been installed and secured as required.

  • Are H-tracks installed correctly, including vertical and horizontal junctions.

  • Are shaft liner panels fitted fully into H-Tracks

  • Have we installed clips in correct locations for the shaft liner.

  • Have we installed clips into H-track correctly with correct screws.

  • Have we installed the correct screws to suit the type and location of the house frame.

  • Have we installed Fyrchek to first floor frame protection zone and roof space zone.

  • Check joints in Fyrchek are tightly aligned and do not coincide with H-track

  • Are screw patterns for laminated Fyrchek sheet correct.

Fished Installation Checks

  • Have the soffits been correctly protected.

  • Are there any cantilevered sections.

  • Are there any penetrations in fire wall.

  • Have we included a fire sealed expansion joint in external wall finishes.

  • Has the manufacturers instructions been followed.

  • Is the wall finished to allow suitable correct installation of adjoining elements, external walls, roof, cladding.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.