Information

  • Document No.

  • Job # & Suburb or Centre Name

  • Name of Centre Director

  • Location
  • Conducted on

  • Higgins Project Manager

PRE-START ASSESSMENT

PRE START ASSESSMENT

  • Scope of Work - Select surfaces to be painted (provide at least 1 photo of each surface, and any specific preparation required). Only previously painted surfaces are to be included.

    Permanent signage must be removed and replaced (e.g. evacuation plans, door signs, exit signs etc.)

    Posters, photos, and artwork is to be removed and neatly left down for the centre manager if it has not already been removed by the staff.

    Include 2 photos of each surface to be painted.

  • CEILINGS

  • WALLS

  • DOORS

  • TIMBER WINDOW FRAMES

  • SKIRTING

  • HANDRAILS

  • FEATURE WALL (only if needed - if so 1 coat only)

  • OTHER (Detail any other surface to be painted)

  • Start Date (agreed with Centre Director)

  • Additional Instructions (Detail any specific site instructions or notes including preparation requirements)

ASSESSMENT HANDOVER (Accepted by Painters)

ASSESSMENT ACCEPTED BY FOREMAN

  • Agreed Completion Date

  • Signed by FOREMAN

  • Signed by PROJECT MANAGER

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.