Title Page
-
File Number
-
EMaint Work Order Number
-
Area of the Equipment
-
Equipment (Take a picture, if possible)
-
Product made at the time of fault
-
Requested by (from Production)
-
Engineer Called on
-
Was the faulty area (section of equipment) cleared of the exposed product before repairs?
Engineering
-
Brief of the issue
-
Finished the work at:
-
Nature of Work
- Breakdown/Parts Replaced
- Drilling/Welding (Hot Works)
- Electrical Fault
- Other
-
If other, please specify:
-
Work Carried Out By
- Ben Panicker
- Grant Phillips
- Ibnu Pookkayil
- Majid Mohammed
- Cameron Aldin
- Contractor
-
Name of the Contractor
-
Signature
-
Signed off by (from Production - Production Manager, Shift Manager or Team Leader)