Title Page

  • File Number

  • EMaint Work Order Number

  • Area of the Equipment

  • Equipment (Take a picture, if possible)

  • Product made at the time of fault

  • Requested by (from Production)

  • Engineer Called on

  • Was the faulty area (section of equipment) cleared of the exposed product before repairs?

Engineering

  • Brief of the issue

  • Finished the work at:

  • Nature of Work

  • If other, please specify:

  • Work Carried Out By

  • Name of the Contractor

  • Signature

  • Signed off by (from Production - Production Manager, Shift Manager or Team Leader)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.