Information
-
Inspection area
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Inspection team
Environmental Management
-
Have all actions from the previous work area inspection been closed?
-
Have regular area inspections been completed by area owners?
-
Does the work area adequately manage clean stormwater?
-
Does the work area adequately manage potentially contaminated stormwater from leaving the work area?
-
Does the work are have sufficient stocked spill kits?
-
Does the work area segregate and store waste correctly for final disposal?
Landfarm
-
Have the beds been sampled?
-
Are the beds free of rubbish?
-
Is the Landfarm designed such that the ingress of uncontaminated stormwater is prevented?
-
Is the design of the landfarm such that any contaminated runoff for the treatment cell is contained?
-
Is the active bed maintained with a suitable soil thickness (30cm)?
-
Is the moisture and nutrient levels within the soil, a suitable content to ensure biological activity?
-
Has the landfarm been aerated (tilled) in the past 4 weeks?
Run off pond
-
Pond level acceptable?
-
Ponds free of rubbish/vegetation?
-
Is overall house keeping ok?
Summary of actions
Sign off
-
Environmental Team Sign Off
-
Department Supervisor or Superintendent sign off