Title Page
-
Conducted on
-
Prepared by
-
Location
Site Access
-
Is the site clear and free from obstructions?
-
Is there a suitable set-down area for materials?
-
Can logistics access the site to deliver equipment?
Axle Counters
-
Axle Counters to be Installed?
-
Have the axle counters been installed without any visible signs of damage? If no, provide details of axle counter number, details of damage and photos.
-
Have all components been provided? If no, provide details and photos.
-
Are conduits clear and draw ropes installed?
Point Machines
-
Point Machines Installed?
-
Have the earth boxes been installed correctly without visible signs of damage? If no, note axle counter number, details of damage and photos
-
Have all components been supplied? If not provide details of missing components and photos of the equipment
-
Are conduits clear and draw ropes installed?
-
Are the point machines free from damage and all components provided?
Wayside Equipment Cabinets
-
Wayside cabinets to be installed?
-
Are pits free from water and debris?
-
Are conduits clear and draw ropes installed?
-
Are pit covers in good condition and bolts provided?
-
Are plinths installed correctly and free from damage?
-
Are the cabinets free from damage?
Capsys Route Detection Loop
-
Capsys Loops Installed?
-
Conduit installed correctly and free from damage?
-
MAS Pits free from obstructions and damage?
-
All components provided and free from damage?
Observations and Concerns
-
Note any other concerns or observations
-
Additional Photos