Information

  • Bridge inspection

  • Document No.

  • Conducted on

  • Prepared by

  • Location

Outstanding issues from pervious Auidit

  • Farm Entrance

  • Photo 2 - Farm Exit

BRIDGE ENDS

  • Guard Rail Ends

  • Bridge Signage in place

DECK

  • Are all Deck beams secure and in good condition

  • Are all Fence panels and posts secured properly.

  • Overall Deck Condition

SUPERSTRUCTURE

  • Are both approach concrete pads in good condition

  • Floor beams

  • Hangers

Inspection Team Summary

  • General Notes

Security

  • Sliding gate operation

Vegetation

  • Is the Bridge free from any vegetation growing up through floor beams

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.