Information
-
JOB NAME
-
JT#
-
DATE
-
QC'D BY
-
FORMAN
AERIAL CONSTRUCTION
-
STRAND INSTALLED,NO CROSSOVER
-
STRAPS AND SPACERS INSTALLED
-
CABLE DELASHED & RELASHED
-
CABLE DOUBLE LASHED
-
CABLE 40 INCH CLEARANCE FROM POWER
-
POLE REFRAMED
-
DOWN GUIDES & ANCHORS INSTALLED W/ YELLOW GUARD
-
BUILDING ATTACHMENT SECURED AT BLDG
-
SLACK LOOPS AT CORRECT LOCATION
-
ORANGE TAGS PLACED ON FIBER POLE ATTACHMENTS
-
TREE TRIMMING
-
RISER GUARDS INSTALLED (2) W/ STICKERS
UNDERGROUND CONSTRUCTION
-
CABLE AT PROPERTY DEPTH 24" TO 36"
-
CLEAN UP \ RESTORATION COMPLETED ( BORE PITS)
-
PEDS BURIED TO PROPER DEPTH AND STRAIGHT
-
STICKERS ON ALL PEDS
-
CABLE PROBED FOR DEPTH
GROUNDING
-
ALL AMPS / LE'S GROUNDED
-
VERTICAL GROUNDS AND HALO'S PLACED
-
GROUND RODS INSTALLED
-
GREEN GROUND TAGS INSTALLED
-
ALL END LINE TAPS GROUNDED
SPLICING
-
END OF LINES CHECKED WITH PROPER LEVELS
-
ALL OPEN PORTS TERMINATED
-
TIE POINT CORRECT ON PRINT
-
HEAT SHRINK INSTALLED ON ALL CONNECTORS
-
CORRECT CABLE USED WITH ADEQUATE TAILS ( PER PRINT )
-
CORRECT PASSIVES USED (TAPS, SPLITTERS, &DC'S )
LOCKBOXES/EMT/BOC
-
MOUNT CORRECTLY AND STRAIGHT
-
PVC/EMT STRAIGHT AND SECURED ( FLASHING)
-
ALL CORE DRILLS FILLED WITH FIRESTOP
-
BOC PLUGGED AT BUILDING
-
PLENUM PLACED AND TAGGED
-
STICKERS INSTALLED (2) ORANGE AND YELLOW
INSTALLATION
-
DROP INSTALLED & TAGGED
MISC
-
DAMAGE AT PROPERTY
-
TRASH LEFT ON JOB
-
CUT AND RESTORE
-
CHARGE BACK
-
PHOTO 1
-
PHOTO 2
-
PHOTO 3
-
PHOTO 4
-
PHOTO 5