Information
-
Document No.
-
Audit Title (Plot No. / Site Address)
-
Location
-
Prepared by
-
Conducted on
Contact details
-
Contact Person (name & telephone)
Issue details
-
Issue
-
Issue Priority Level
-
Issue Category
- Flooring
- Shelving
- General
- Insulation
- Patio Doors
- Wooden Flooring
- Decorating
- Kitchen Units
- Doors
- Seals
- Shower
- Wall Tiling
- Windows
- Kitchen
- Floor Tiling
- Locks
- Plastering
- Carpeting
- Balcony Doors
- Glazing
- Guttering
- Plumbing
- Roofing
- Electrical
- Kitchen Drawers
- Vinyl Flooring
- Appliances
- Balustrade
-
Issue Location
- Kitchen
- Dining Room
- Entrance Hall
- Loft
- Shower Room
- Lounge
- Hallway
- Upstairs Hallway
- Cloakroom
- Downstairs Cloakroom
- Bathroom
- Upstairs Bathroom
- Ensuite
- Bedroom 1
- Bedroom 2
- Bedroom 3
- 2nd Floor Bedroom
- Staircase
- Front Door
- Utility Room
- Boiler Cupboard
- Shed
- Top Floor
- Various
-
Issue Description
-
Likely cause of issue
-
Image before repair
-
Image after repair
-
Materials/repair details
Declaration
Declaration by owner/occupier
-
As owner/occupier of the above mentioned property I hereby confirm that I am satisfied with the remedial works carried out at my property and that I am satisfied that during these works my property and possessions have been left in the state in which they were found.
-
Owner/Occupier
-
Sub-Contractor
-
Representative