Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Team Leader:
-
Operative 1:
-
Operative 2:
-
Operative 3:
-
Date:
-
Vehicle Registration:
-
Contract:
-
Location:
-
Work In Progress:
-
Contract Manager:
-
FLM / Auditor:
1.0 Site Observations
-
1.1 Safe Access/Egress to work site?
-
1.2 Appropriate warning signs posted?
-
1.3 Vehicles clean and tidy?
-
1.4 Is vehicle; Secure / ignition keys removed / parked safely?
-
1.5 Signing and guarding correct? ( NRSWA)
-
1.6 Pedestrian / Public safety satisfactory?
-
1.7 Housekeeping - Safe and tidy site?
-
1.8 Operatives working safely - wearing PPE?
2.0 Documentation
-
2.1 Individual ID / Authorisation / DNO Rules Card on site and Available?
-
2.2 Team Leader Pack Complete?
-
2.3 Site specific risk Assessment for the location Sufficient and all team aware of requirements?
-
2.4 Utility Plans available, legible and current?
-
2.5 Are all Training Certificates i.e. MEWP, Plant, Chain saw, Strimach etc. Cards on site in date?
-
2.6 Distribution Safety Rules, Operational Practice Manual Authorisations, NEDL / YEDL id card Available and in date?
-
2.7 Relevant Safety Alerts, Tools Box Talks Received and Understood?
-
2.8 Are safety docs PTW, LOAF work instructions adequate and understood?
3.0 Plant & Equipment
-
3.1 CAT Present?
-
CAT Number:
-
Next Calibration Due:
-
3.1.1 Genny Present?
-
Genny Number:
-
Next Calibration Due:
-
3.2 Megger, Earth Loop, Volt Meter Test Lamps, Proving Unit, Rotoscope, KP Tester, Portable Earths HV, LV in test and stored safely in a dry bag. (HV test set if in use)
-
3.3 Fire Extinguisher present and in date?
-
Calibration due date and Kg:
-
3.4 Lifting Equipment (chains, shackles, slings, winch) in good order and within calibration?
-
3.5 Excavator in good working order and fit for purpose?
-
3.6 Plant & Machinery in good working order (e.g. Strimach)?
-
3.7 Trailer in good order - lights, number plate, break away cable etc?
-
3.8 MEWP / Strimach (other) LOLER in date?
-
3.9 Are general and insulated hand tools in good condition no significant damage?
-
3.10 Ladders tested, tagged, in date? Rungs, stiles,hooks, guides in good condition?
-
3.11 Have all staff been trained in all tools & working techniques?
4.0 Electrical Safety
-
4.1 Permit to work completed and communicated?
-
4.2 Earths applied as management instruction?
-
4.3 Work taking place in clear site of applied Earth?
-
4.4 Earths applied within 3 spans of point of work?
-
4.5 LV arrangements-Earthing, phase rotation/polarity, test lamps & proving.
-
4.6 Safe system of work as method statement?
-
4.7 Has a Full CAT & Genny Survey been conducted & trial holes excavated? Services marked?
5.0 Welfare
-
5.1 Provision for obtaining Hot Water?
-
5.2 Suitable arrangements for toilets?
-
5.3 Suitable facilities for washing available?
-
5.4 Soap and towels / wipes available?
-
5.5 First Aid Kit & Eye wash available and in date?
-
5.6 Plant, equipment, materials and vehicles arranged safely to protect staff & public?
6.0 Personal Protective Equipment
-
6.1 Flame retardant overalls in good order and being worn?
-
6.2 Hearing/Eye/Head/Dust Masks/Hand/Safety Footwear. Full face visor available, worn if required?
-
6.3 Hi-Viz and wet wear available, suitable and worn if required?
-
6.4 Insulated work gloves Class 0, 1(delete as required) in test.
-
6.5 Harness/Pole Choke/Climbing irons inspected adjusted & attached where required?
-
6.6 Ariel rescue kit unopened and available at work site?
-
6.7 Is all PPE being correctly stored?
7.0 Environment
-
7.1 Are appropriate sized spill kits readily available?
-
7.2 Is waste correctly separated for disposal?
-
7.3 All containers correctly labelled?
-
7.4 Hazardous materials stored correctly?
-
7.5 Are all containers fit for purpose?
-
7.6 Is COSHH information available, understood and complied with?
8.0 Work Practice
-
8.1 MEWP. Stabilisers, Spreaders in use?
-
8.2 Harness worn if working in platform? ( MEWP?)
-
8.3 Shrouding applied live working procedures followed?
-
8.4 Earth, Locks, Notices applied?
-
8.5 No persons working below person working at height?
Footer
-
Comments and Actions required:
-
Image of site.
-
Sketch here, if required.
-
FLM / Safety Auditor:
-
Add signature
-
Team Leader:
-
Add signature
-
Actions Completed / Closed Off?