Title Page
General Details
-
Person conducting inspection
-
Department
-
Area being inspected
-
Date and time of inspection
-
Please consider all areas of on-site activities at a place where such activities are being carried out.
Active Area Inspection Details
-
Area Inspection Location
-
Actions
-
Was Field Leadership Conducted
-
Type and ID of Field Leadership Completed
- TTT
- PTC
- CCO
-
Take photo (Genral Area Photo of Work Location)
Risk Assessments and Permits
-
For working being completed in the area, was a risk assessment conducted for the task observed?
- Informal (BMA Safe)
- Formal (JSA)
- None
-
For the work being completed in the area, was the appropriate permit observed?
- Working at Heights Permit
- Hazardous Work Permit
- Confined Space Permit
- Hot Work Permit
- Permit to Penetrate / Dig
- Permit to Disturb
- High Voltage Access Permit
- Permit to Travel under Powerlines at Non-Designated Areas
- None
-
Was the Risk Assessment at the Job front?
-
Were all team members signed on to the Risk Assessment on the day of inspection?
-
Reason why team members are not signed on to Risk Assessment
-
Did you stop the Task and amend the JSA?
-
Take photo of any risk assessments / permits
Checklist
-
Please consider the prompt list below as a guide when conducting the Area Inspection
-
1. General
-
1.1 Edge protection / bunding - In place and adequate for Hazards?
-
1.2 Seatbelt use verified in vehicles and mobile equipment
-
1.3 Hazards - clearly marked, appropriately managed?
-
1.4 Overhead power lines identified
-
1.5 Personal protective equipment - adequate for task?
-
1.6 Pre-start inspections - completed and defects rectified/managed?
-
Additional comments/At Risk Observations
-
Photo of completed Pre starts
-
1.7 Positive communication
-
Please specify communication method.
-
1.8 Roads - condition
-
1.9 Signage - appropriate, in place, visible
-
1.10 Vehicle parking - Parked in Designated Location? Wheels Chocked?
-
1.11 Visibility - lighting, dust, obstructions
-
1.12 Waste management - correct bins, accumulated waste, spill kits
-
Additional comments/At Risk Observations
-
Take photo (at risk Items)
-
2. Housekeeping Daily
-
2.1 No unnecessary items found in and around the area?
-
2.2 Only equipment needed for the task being performed is within the area?
-
Why?
-
2.3 All tooling and material is stored safely and cannot fall or cause injury?
-
2.4 Is the work area free from waste and redundant materials?
-
3. Work Area's Daily
-
3.1 Access – clearly delineated & safe
-
3.2 Cranes / Hoists / Winches/ Rope – safe condition
-
3.3 Defective equipment – tagged ‘Out of Service’ and quarantined
-
3.4 Dust, fumes, gas vapors present in the work area
-
3.5 Equipment – fit for purpose, test/tag, no prohibited items
-
3.6 Fencing and barricades – in place, suitable
-
3.7 Hand tools – serviceable, stored in designated area
-
3.8 Chemicals – Are all chemicals correctly stored, Is the chemical approved for site, Is PPE in line with MSDS
-
3.9 Ladders – Safe condition, Secured
-
3.10 Scaffolds – inspected and tag attached, suitable condition, no gaps, or uneven surfaces in work platform
-
3.11 Is mesh guarding required to handrails to prevent dropped objects
-
3.12 Stairways/Ladders – clear, adequate, and secure
-
3.13 Work Platforms – suitably sized, safe, and secure
-
3.14 Are steps-ups being used and has the proximity to the edge/handrail been considered
-
3.15 Power leads elevated and secured using insulated hooks, leads not run over sharp edges
-
3.16 Is all thermal cutting equipment in good order, correct for task, in date and away from the line of fire
-
Additional comments/At Risk Observations
-
Take Photo
-
4. Welding Activities
-
4.1 Leads run in a way not to create trip hazards
-
4.2 Leads in good condition no exposed copper wire
-
4.3 Connections in good condition no exposed connectors
-
4.4 Is the Ground/Earth clamp positioned on the pieces being welded
-
4.5 Is the Ground/Earth clamp positioned as close as possible to the area being welded
-
4.6 Is the Ground/Earth clamp securely fastened and is the connection free from paint or corrosion
-
4.7 Is the LN25 Ground/Earth placed as close as possible to the area being welded
-
4.8 Is the CMW’s body position between the work area and Ground/Earth clamp
-
4.9 Where the CMW body is resting on steelwork is an insulation material being used
-
4.10 Is the surrounding electrical cables and equipment protected from welding activities
-
4.11 Are all gas hoses in good working order and run in a way not to introduce additional hazards
-
Additional comments/At Risk Observations
-
Take photo
-
5. Work Area's Affected by Water and Rainfall ingress
-
5.1 Is there standing or dripping water in the work area
-
5.2 Is the steelwork within the work area wet
-
5.3 Are the leather blankets damp or wet
-
Additional comments/At Risk Observations
-
Take photo
Sign off page
-
Select date
-
Add signature