General
-
Time
-
ITP Inspection
-
Inspection Type
- Clear & Grub
- Strip Topsoil
- Excavation
- GST
- Subgrade / Unbound Pavement
- Culverts
- Gabion Baskets & Mattresses
-
Basic Location
- Access Roads
- EPCM
- Overland Conveyor
- ROM Reclaim
- ROM Transfer Pad
- MIA
- Raw Coal Stockpiles
- CV-045
- TS-044
- CV-008
- General Surface Aress
- MSF
- M&M Drift
- Mainteck Offsite Yard
- CV Drift
- Product Coal Stockpile
- CHPP
-
Specific Location/s
-
Attendees
- Mark Sanders
- Bruce Johnston
- Wylie Pearson
- David Seaver
- Mal Pringle
-
Other Attendees
Inspection
-
Culvert Type
-
1. Underlying Lots Closed
-
2. Permits in place
-
3. Precast Culverts Comply with Drawings
-
4. Precast Bases and End Structures Comply
-
5. Base Excavation ready for blinding - clean and compaction >95%
-
6. Cast in place base and Apron Slab Prepour OK
-
7. Precast Culverts Installed According To Drawings
-
8. Head Wall Prepour OK
-
9. Culvert Approved for Backfilling
-
10. Backfilling Satisfactory with Compaction results
-
11. As built survey complete
-
1. Underlying Lots Closed
-
2. Precast units are correct class
-
3. Culvert set out correct
-
4. Excavation according to drawings, with base compaction >95%
-
5. Foundation bedding correct
-
6. Pipes installed According to Drawing
-
7. Back filling according to requirements
-
8. Head walls Installed according to Drawings
-
9. Back filling compaction complies with requirements
-
10. As built survey complete
-
1. Underlying Lot Closed
-
2. Geofabric Installed Correctly
-
3. Gabion Basket & Mattress Installed
-
4. Rocks Placed in Gabions & Mattresses according to specification
-
1. Underlying Lot Closed
-
2. Geofabric Installed Correctly
-
3. Rock Placement Acceptable
-
4. As built survey complete