Information
-
Document No.
-
HDPE Liner Inspection
General
-
Time
-
ITP Inspection
-
Inspection Type
- Clear & Grub
- Strip Topsoil
- Excavation
- GST
- Subgrade / Unbound Pavement
- PilingWorks
- Dam Liner
-
Basic Location
- Access Roads
- EPCM
- Overland Conveyor
- ROM Reclaim
- ROM Transfer Pad
- MIA
- Raw Coal Stockpiles
- CV-045
- TS-044
- CV-008
- General Surface Aress
- MSF
- M&M Drift
- Mainteck Offsite Yard
- CHPP
- Product Coal Dam
- SK041 RCS Stacker
- RE041 RCS Reclaimer
- Substation MP-SU-422
- Substation MP-SU-444
- Substation G1-SS-H01
- Substation G1-SS-A01
-
Specific Location/s
-
Attendees
- Mark Sanders
- Bruce Johnston
- Wylie Pearson
- David Seaver
- Mal Pringle
- Phil Adlam
- David Middleton
-
Other Attendees
Inspection
-
Underlying Lots Closed
-
Add notes
-
Add photos
-
Dam surface acceptable
-
Add notes
-
Add photos
-
Dam surface compaction >97%
-
Add notes
-
Add photos
-
Anchor trench location 1000mm from pond edge
-
Add notes
-
Add photos
-
Anchor trench back fill compaction >95%
-
Add notes
-
Add photos
-
Liner panel layout approved
-
Add notes
-
Add photos
-
Liner Weld tests acceptable
-
Add notes
-
Add photos
-
Field weld NDT test results acceptable
-
Add notes
-
Add photos
-
As built survey
-
Add notes
-
Add photos
Signoff
-
Inspector
- Mark Sanders
- Bruce Johnston
- Wylie Pearson
- David Seaver
- Mal Pringle
- Phil Adlam
- David Middleton
-
Signature