safetyculture-logo
Log in Get started for FREE
Back to home

Search

Login to iAuditor
Get started for FREE
Home
Local Government
GSO/FAC Residential Inspection Checklist- Libreville
GSO/FAC Residential Inspection Checklist- Libreville
Jeff Collett

GSO/FAC Residential Inspection Checklist- Libreville

Commonly known as the “Make Ready” checklist.

Use this Digital Checklist
Download as PDF
graphic of a hand making an okay sign ×

Free GSO/FAC Residential Inspection Checklist- Libreville Checklist

Use this Digital Checklist

Template Preview

app-store-download play-store-download

GO DIGITAL TODAY
Convert your paper checklists into digital forms

Scan this QR code to use this paper checklist on your smartphone or tablet. Visit www.iauditor.com

Scannable QR Code to download App

Audit

Date
Address

Property Type

Lease Start Date

Does this property have a pool?

Sq. Footage

RPA #

# Bedrooms

# Bathrooms

Generator KW

Generator NEPA #

Generator ATS NEPA #

Cistern Size

Cistern Gallons

Facilities Inspector

Landlord
Landlord
Facilities Manager
Facilities Manager
GSO
GSO
RSO
RSO
Location: General
If there is work to be done, mark the appropriate group it must be done by (FAC, GSO, LL, CON).
Key Sets Labeled
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Gas Delivered/Scheduled
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Cistern Clean/Filled
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Electrical Meter/Box
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Water System: Provide pressure setting.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Hot Water Heater: Provide temperature setting.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Generator Test
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Doorbell Test
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Electric Panel Labeled
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Electrical Grounding: Ensure panel is labeled in English and French
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Patio Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Welcome Kit: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Curtains Installed: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Drinking Water: Distiller cleaned and functioning
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
6' Step Ladder: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Security Grills/Doors
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Alarm Installation: RSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Guard Booth: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GSO Inspection
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Exterior
Street Entrance Keys
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Roof Inspection
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Gutters Cleaned
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lawn/Property/Trees
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Patio Clean/Damage
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Septic Tank/Access
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Driveway/Sidewalks
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Pool Fill/Clean/Test
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlets
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Exterior Lights
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Barb Wire or Picket Installation
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Security Lights
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Exterior Quarters
Doors/Locks/Keys: Ensure keys work in locks and are properly installed with no interior key operation.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Exterior Bathroom
Doors/Locks/Keys
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/GFCI Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Sink: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Shower: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet: Ensure new assemblies are installed in tanks and function correctly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet Paper Holder
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Laundry Room
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlets
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Sink: Check drain and Hot/Cold water. All houses should be equipped with a sink.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Washer Connections: Ensure that filter screens are installed on incoming hot/cold water lines.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Washer: Verify cleanliness, operation and proper drainage.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Dryer Connections: Bucket of water installation not permitted. Either direct vent to outside or ventless dryer. *Ventless dryer will require fixing the unit to the floor.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Dryer Test: Verify cleanliness and proper operation.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Entryway
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled. Interior of lock should be a turn lock, not a key.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Kitchen
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled. Exterior doors should have a turn lock on the inside.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Fire Extinguisher
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlets
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation;ensure that filters and the unit are cleaned.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Kitchen Cabinets
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Counter Top
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Sink: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Gas Shut Off Valve: Required to be within 6 feet of the appliance. Piping should be yellow and valve easily accessible.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Stove Test: Test all Burners and Oven operation.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Hood Fan/Light
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Refrigerator Test: Ensure cleanliness, light works and refrigerator functions properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Freezer Test
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Dining Room
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Living Room
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Hall/Mezzanines
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Smoke Detectors: Ensure new batteries are installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Master Bedroom

Doors/Locks/Keys:
Ensure keys work in locks and are properly labeled.

Smoke Detector: Ensure new batteries are installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Closet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan Test
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Master Bathroom
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Medicine Cabinet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Sink: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet: Ensure new assemblies are installed in tanks and function correctly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathtub/Shower: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Shower Door/Rod: Install curtain if provided.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Towel Rods
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet Paper Holder
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bedroom #2
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Smoke Detector: Ensure new batteries are installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Closet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathroom #2
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Medicine Cabinet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done

Windows/Screens:
Ensure all windows/screens open and close properly.

Sink: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet: Ensure new assemblies are installed in tanks and function correctly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathtub/Shower: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Shower Door/Rod: Install curtain and rod if provided.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Towel Rods
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet Paper Holder
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bedroom #3
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Smoke Detector: Ensure new batteries are installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Closet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathroom #3
Doors/Locks/Keys: Ensure keys work in locks and are properly installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Medicine Cabinet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Sink: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet: Ensure new assemblies are installed in tanks and function correctly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathtub/Shower: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Shower Door/Rod: Install curtain and rod if provided.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Towel Rods
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet Paper Holder
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bedroom #4
Doors/Locks/Keys: Ensure keys work in locks and are properly labeled.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Smoke Detector: Ensure new batteries are installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Closet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
A/C: Verify complete operation; ensure that filters and unit are cleaned. Verify slope of evacuation pipe. Verify condition of condensing unit. LL A/C units should be replace with FAP A/C units with brands acceptable to this climate.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling Fan
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Furniture: GSO Responsibility.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathroom #4
Doors/Locks/Keys: Ensure keys work in locks and are properly installed.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Walls
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Floor
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Ceiling
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Medicine Cabinet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Lights/Receptacles
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
GFCI Outlet
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Windows/Screens: Ensure all windows/screens open and close properly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Sink: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Toilet: Ensure new assemblies are installed in tanks and they function correctly.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done
Bathtub/Shower: Check drain and Hot/Cold water.
  • FAC
  • LL
  • CON
  • GSO
  • RSO
  • Done

Additional Comments

GSO/FAC Residential Inspection Checklist- Libreville
Jeff Collett

GSO/FAC Residential Inspection Checklist- Libreville

Commonly known as the “Make Ready” checklist.

Use this Digital Checklist
Download as PDF
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.

Related checklists

GSO/FAC Residential Inspection Checklist- Libreville
Michel Ekogha
GSO/FAC Residential Inspect...
Commonly known as the “Make Ready” checklist.
4 downloads
Combined POSHO, Facilities & GSO Residential Inspection Check List - Gaborone
Orlin Clements
Combined POSHO, Facilities ...
Commonly known as the “Make Ready” checklist.
14 downloads
OSHA Office Safety Checklist- Libreville
Jeff Collett
OSHA Office Safety Checklis...
This iAuditor template is based on the OSHA Office Safety Stan...
3 downloads
Residential Slab & Footing Inspection
Matthew Wilson
Residential Slab & Footing ...
Inspection template based on AS 2870
104 downloads
Residential Final Checklist Stealth Electric
Austin Clews
Residential Final Checklist...
This is the checklist to be done after everything is finished ...
7 downloads
SHEM Residential Checklist under 15 FAM 211.1
FAC Maintenance Team
SHEM Residential Checklist ...
TEMPLATE TO CONDUCT INSPECTION ACCORDING SHEM CHECKLIST.
18 downloads
Bank Stability Hazard Inspection Checklist
Joshua Moore
Bank Stability Hazard Inspe...
Hazard Inspection Checklist used in the evaluation of Bank Sta...
10 downloads
Homeowner Well Inspection Checklist
SafetyCulture Staff
Homeowner Well Inspection C...
Use this well inspection checklist to assess the condition of ...
3 downloads
back arrow for carousel
back arrow for carousel

Don’t start from scratch each day

Use iAuditor to create and update checklists in minutes, deploying to your whole workforce from one application.

Find out how
  • Product
    • Product

    • iAuditor
    • Temperature logging
    • TeamTrain
    • Spotlight
  • Resources
    • Resources

    • Templates
    • Checklists
    • Topics
    • Blog
    • Events & Webinars
    • Apps
    • API
  • Support
    • Support

    • Support center
    • Product updates
    • Book a demo
    • Integrations
  • Company
    • Company

    • About us
    • Careers
    • Meet the team
    • Contact us
Status Privacy & Terms Security
iAuditor Logo Icon ©SafetyCulture 2021