Title Page
-
Conducted on
-
Prepared by
-
Location
Materials and Plans
-
1. Are IFC plans current.
-
2. Pipe correct size and pressure rating for job, all fittings, tapping bands as per to GVW preferred equipment list.
-
3. Materials received on site undamaged and stored correctly.
Construction
-
1. Clearance from other services (Dial Before you dig)
-
2. Trench width and depth is correct as to IFC Drawings.
-
3. Bedding material meets specification.
-
4. Bedding depth and cover over pipe as on IFC Drawings
-
5. Side clearance of trench to pipe as on IFC Drawings
-
6. Pipes being installed are clean.
-
7. Adequate Thrust restraint.
-
8. Correct approved back fill material is being used.
-
9. Correct layers of back fill material is placed to achieve compaction requirements.
-
10. Correct method of compaction of trenches.
-
11. Swabs are inserted, numbered and photographed.
-
12. Damage to property services are repaired (Stormwater, Sprinklers etc.)
-
13. Damage to nature strips repaired.
Connection
-
1. Swabbing done and swabs removed and photographed.
-
2. Water quality tests are approved.
-
3. Shut down notices for connection are submitted.
-
4. Galvanised services are replaced with Copper/Pressure PE pipe with a trace wire connected from ferrule to copper tail before meter (safety controls working around metallic services in place).
-
5. Ferrules are turned on.
-
6. Property garden tap flushed.
-
Photos
-
Comments