Information
-
Hager B&R - Queensland & Northern NSW Projects
-
Document No.
-
Switchboard design conducted on
-
Designed by
-
Submit to Estimator for approval and pricing
Project Details
-
Date:
-
Project Name:
-
Site Address?
-
Add location
-
Project Status
-
Date required on site?
-
Add Wholesaler
Wholesaler details
-
Wholesaler & Branch?
-
Wholesaler contact
-
Wholesaler phone number & email?
-
Add Contractor
Contractor Details
-
Contracting company
-
Contact name
-
Contact email
-
Contact mobile
-
Supply Authority?
Switchboard Attributes
-
Rated Current?
-
Fault Current kA level?
-
Mains Cable Size?
Enclosure Type
-
Mounting Method?
- Wall
- Access plinth
- Floor
-
Switchboard to be installed...
-
Frames?
-
Cabinet
-
Colour?
Cable entry & exit
-
Entry
-
Exit
Space
-
Maximum space available? (in metres)
Pricing
-
Value-add assembled
-
Assembled & Wired
-
Metalware assembled only
-
Shipping breaks required?
-
Components Loose
Main Isolator
-
Switchboard main isolator required?
-
Load Break Isolator
-
MCCB?
-
Rating (Amps)?
CT Metering
-
CT Metering required?
-
Number of tenancies?
-
Community single phase required?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Community three phase required?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Private metering?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Allow fitting of CTs and Testblock
-
CT Chassis amperage?
- 200A CT Module
- 400A CT Module
- 630A CT Module
-
CT Isolator required?
-
Main isolator type?
- MCCB
- Loadbreak
-
Current Rating?
-
Sub-main MCCB breakers required?
-
Number, rating & type of each?
-
Active links required?
-
Size & rating of active links required?
-
Quantity of active links required?
-
MG102P meter panel required as backing for active links?
-
Neutral links required?
-
Size & rating of neutral links required?
-
Quantity?
-
LH907 Isolation links required?
-
Quantity of isolation links required?
-
Shared neutral to sub-boards, where more than one tariff is present? (Ensure that double pole switching is added in Switchgear section, isolators, circuit breakers or otherwise)
-
Additional equipment/Special Instructions?
Whole current metering
-
Whole current metering required?
-
Number of three phase tenancies?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Number and type of OFF-Peak tariffs required?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Community three phase required?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Number of single phase tenancies?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Number and type of OFF-Peak tariffs required?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Community single phase required?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Private metering?
-
Type of meters?
- Standard
- Integrated
- Polyphase
- AF Receiver(s)
-
Sub-main MCCB breakers required?
-
Number, rating & type of each?
-
Active links rquired?
-
Size & rating of active links required?
-
Quantity of active links required?
-
MG102P meter panel required as backing for active links?
-
Neutral links required?
-
Size & rating of neutral links required?
-
Quantity?
-
LH907 Isolation links required?
-
Quantity of isolation links required?
-
Shared neutral to sub-boards, where more than one tariff is present? (Ensure that double pole switching is added in Switchgear section, isolators, circuit breakers or otherwise)
-
Additional equipment/Special Instructions?
Ancillary Products
-
Temporary site boards?
-
Wiring accessories?
-
Other products to be added to this project
-
Distribution boards or panelboards?
-
Golf?
-
Mounting
-
Type
-
Pole size?
-
Door type?
-
Quantity required?
-
Performa?
-
Series?
-
Value add required for assembly of Performa panelboards & switchgear?
-
Classic IP30
-
No. of Poles for Classic required
- 24 Pole
- 36 Pole
- 48 Pole
- 60 Pole
- 72 Pole
- 96 Pole
-
Emergency lighting kits unwired?
- Emergency Lighting kit 4P
- Emergency Lighting kit 2P
-
Quantity required?
-
Other accessories required?
-
Apex IP43
-
No. of Poles for Apex required
- 24 Pole
- 36 Pole
- 48 Pole
- 60 Pole
- 72 Pole
- 96 Pole
-
Main Switch type?
-
Door Colour?
-
Extension box?
-
Emergency lighting kits unwired?
- Emergency Lighting kit 4P
- Emergency Lighting kit 2P
-
Quantity required?
-
Other accessories required?
-
Apex Plus IP43
-
No. of Poles for Apex Plus required?
- 24 Pole
- 36 Pole
- 48 Pole
- 60 Pole
- 72 Pole
- 96 Pole
-
Main Switch type?
-
Door Colour?
-
Extension box?
-
Emergency lighting kits unwired?
- Emergency Lighting kit 4P
- Emergency Lighting kit 2P
-
Quantity required?
-
Other accessories required?
-
Split Chassis Required?
-
Split chassis size?
- 36 Pole 18 top 12 bottom
- 48 Pole 24 top 18 bottom
- 48 Pole 30 top 12 bottom
- 60 Pole 36 top 18 bottom
- 60 Pole 48 top 12 bottom
- 72 Pole 48 top 18 bottom
- 96 Pole 72 top 18 bottom
-
Elite IP66
-
No. of Poles for Elite required?
- 24 Pole
- 36 Pole
- 48 Pole
- 60 Pole
- 72 Pole
- 96 Pole
-
Stainless steel?
-
Main Switch type?
-
Door Colour?
-
Extension box?
- Standard 2 DIN
- Standard blank
- Orange 2 DIN
- Orange blank
-
Emergency lighting kits unwired?
- Emergency Lighting kit 4P
- Emergency Lighting kit 2P
-
Quantity required?
-
Other accessories required?
-
Split Chassis Required?
-
Split chassis size?
- 36 Pole 18 top 12 bottom
- 48 Pole 24 top 18 bottom
- 48 Pole 30 top 12 bottom
- 60 Pole 36 top 18 bottom
- 60 Pole 48 top 12 bottom
- 72 Pole 48 top 18 bottom
- 96 Pole 72 top 18 bottom
Switchgear Required
-
MCCB H3 required?
-
Quantity, type & rating?
-
SBR Isolators
-
Number & rating of single pole isolators?
-
Number & rating of double pole isolators?
-
Number & rating of triple pole isolators?
-
MCBs
-
C-Curve circuit breakers?
-
Number of Single pole 10kA C Curve MCBs?
-
Number of double pole 10kA C Curve MCBs?
-
Number of triple pole 10kA C Curve MCBs?
-
D-Curve circuit breakers?
-
Number of Single pole 10kA D Curve MCBs?
-
Number of Double pole 10kA D Curve MCBs?
-
Number of triple pole 10kA D Curve MCBs?
-
RCBOs
-
Number of 10kA RCBOs and other combination devices?
-
Number of 6kA RCBOs and other combination devices?
-
Busbar required?
-
Polyphase busbar required?
-
Size?
-
Quantity?
-
KF83F 35sq.mm cable connector required?
-
Single phase busbar required?
-
Size?
-
Quantity?
-
Neutral Bi-pole busbar required?
-
Size?
-
Quantity?
-
KF83D 35sq.mm cable connector required?
-
AOBs
-
Number and type of AOBs required?
-
Fatboy MCBs
-
Number, size & rating of 10kA C Curve fatboy MCBs?
-
Number, size & rating of 15kA C Curve fatboy MCBs?
-
Number, size & rating of 15kA D Curve fatboy MCBs?
-
Contactors?
-
Number, size & rating of contactors?
-
Correct contactor(s) selected for load rating specified?
-
Heat inserts LZ060 required?
- 1
- 2
- 3
- 4
- 5
- 10+
-
Timeclocks?
-
Number and type of timeclocks required?
-
Further information or additional comments
-
Photos to be added for visual benefit?
-
Drawings added
-
Approval signature of Contractor
-
Signature of designing officer