Title Page
-
Conducted on
-
Prepared by
-
Location
-
Are Workers Medically Fit for work?
-
Is the Team wearing the correct PPE to be on the project? (steel tip shoes, Hard Hat, Reflective Vest)
-
Is access to the work place safe?
-
Have the tools been pre inspected and in good conditions to work with for the tasks of the day?
-
Have the appropriate permits been signed?
-
Is there any lifting and rigging required for the day's activity with loads greater than 3tons or abnormal shape?
-
Is there any excavation required deeper than 2m planned for the day's activity?
-
Do all scaffold in your area have the correct tag placed and signed for?
-
Have the team members been properly trained for works
-
Is the MS RA for the activity availble on site?
STOP LOOK THINK ACT
Activities above
-
Are there any construction activities happening above your area of work?
-
Has the team leader of that activity been notified?
-
Has your team be notifed?
-
Is the area barricade to limit access?
Activities below
-
Are there any construction activities happening below your area of work?
-
Has the Team leader of that activities been notified
-
Has your team be notified
-
Is the area of work been barricade to restrict access
Activities Adjacent Work area
-
Are other teams working in the same area as your team
-
Have you informed their team leader of your activity
-
Is your team aware of their activities
-
Are any mobile plant being used in this area
-
is there a flag man available
Tasks
-
List main Construction activities for the day
- Excavation with plant
- Formwork with labour
- Fixing rebar with labour
- Femoving formwork from structure
- Casting concrete slab
- Casting Concrete vertical element
- house keeping
-
What Main hazards are present in work area?
- Trip hazard
- injury to body hazard
- Damage to property hazard
- Electrocution hazard
- Drowning hazard
- Fall from height Hazard
- Repetition of body movement hazard
- scaffold material collapse
- Trench Collapse
-
What Controls have been put into place to ensure compliance for Daily task
- Compentence person inspected scaffold
- Trench area has been inspected
- Edge protection has been inspected
- House keeping done
- Covering of floors and holes are done
- fall protection harness are worn by team members
-
Team attendance photo for DSTI
-
pre start area of work photo
Compliance and Signature Page
I hereby certify that the above items were checked and all workers under my supervision received a safe task
-
Foreman Name
-
Foreman Signature
-
Team leader Name
-
Team Leader Signature