Information
-
Location
-
Address
-
Start date
-
Inspected on
Please complete this pre - plaster inspection accurately.
-
1. Site access clear
-
2. Power / Water
-
3. Brickwork completed.
-
4. Job swept out.
-
5. Alfresco / Porches are levelled.
-
6. Ceiling noggins & perimeter of garage / porch / alfresco trimmed out.
-
7. Insulation installed.
-
8. Roof covered / flashing / gables complete.
-
9. Man hole marked.
-
10. Carpenter lock up complete.
-
11. Plumbers rough in complete.
-
12. Electricians rough in complete.
-
13. Ducted heating complete.
-
14. Meter box installed correctly.
-
15. Shower bases / baths installed and not damaged.
-
16. Protrusion beams / brackets / scaffolding OK.
-
17. Check ceiling height to plan, are they the same.
-
20. Reveals / Niches marked.
-
Comments:
-
Non Compliance / Corrective Action Required
-
Inspected By:
-
Signature: