Information

  • Location
  • Address

  • Start date

  • Inspected on

Please complete this pre - plaster inspection accurately.

  • 1. Site access clear

  • 2. Power / Water

  • 3. Brickwork completed.

  • 4. Job swept out.

  • 5. Alfresco / Porches are levelled.

  • 6. Ceiling noggins & perimeter of garage / porch / alfresco trimmed out.

  • 7. Insulation installed.

  • 8. Roof covered / flashing / gables complete.

  • 9. Man hole marked.

  • 10. Carpenter lock up complete.

  • 11. Plumbers rough in complete.

  • 12. Electricians rough in complete.

  • 13. Ducted heating complete.

  • 14. Meter box installed correctly.

  • 15. Shower bases / baths installed and not damaged.

  • 16. Protrusion beams / brackets / scaffolding OK.

  • 17. Check ceiling height to plan, are they the same.

  • 20. Reveals / Niches marked.

  • Comments:

  • Non Compliance / Corrective Action Required

  • Inspected By:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.