Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site control
-
Hazard board signage up to date <br>
-
Environmental plan issues
-
Tool bod talks up to date
-
Safety inductions for all on site
-
Safety notice board current
Site facilities
-
Toilets clean with toilet paper
-
Clean water drinking and washing
-
Smoko shed tidy and clean
General site tidiness and accessways
-
Clean and safe access to work areas
-
Stairways and access ways clear
-
Hoarding fences and gates all safe and secure
-
Loose materials secure from wind
Personal safety equipment
-
Corrected ppe
-
Signage display and legible
-
Hard hats being worn depending on site
-
Safe boots being worn by all sighed in to site
-
Corrected ppe for job (muffs eye protection mask)
First aid / fire prevention
-
First aid box
-
Is it current
-
Is it available
-
Accident register
-
Fire extinguisher
-
Available
-
Current (12mth)
-
Sufficient number
-
Evaluation procedures current
-
All emergency services listed
Compressed air equipment
-
In good working condition
-
Appreciate guards fitted
-
Is user trained on us
Excavations
-
Correctly shored
-
Covered or fenced off safely
Electoral equipment
-
Main board lockable and weather proof
-
All leads current tags and free from damage
-
All life guards tagged and up to site regs ( no domestic once)
-
All leads in a safe place not across door ways or stair wells
-
All tools and equipment in good working condition and up to date tags
-
Adequate lighting for job on sight
Chemicals
-
All chemicals stored safely and correctly
-
Safety data sheet available
-
User using correct ppe
Tools
-
All tools have current tag
-
Staff trained in us of tool
-
All tool have safety guards fitted and in use
-
Using corrected tool for job in safe manner
Scaffoldings
-
Notifiable weekly scafftag / current
-
Hand rails mid rails fitted correctly
-
All toe boards fitted
-
All work platforms safe
-
All ladders fitted off to scaffolding
-
Clear around base of scaffolding
-
Work area on scaffolding clear and tidy
-
Plans all fitted safely and securely
-
Clear head room
-
Adequate ties and braces
Ladders
-
All ladders must be to a heavy duty
-
In good working condition
-
Must be secure top and bottom
-
Working 2 steps down in safe manner