Title Page
-
Site conducted
-
Date
-
Address
-
Prepared by
Handover Document
-
Work Description
Photos
Completion and Sign-Off
-
We confirm that the contracted works to the above address are complete and finished to a satisfactory standard and no damage to the property or resident’s belongings have occurred during the works.
-
Client (Name and Signature)
-
Position
-
Engie (Name and Signature)
-
Position