Title Page
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Control Equipment
Panel Information
-
Manufacturer:
-
Model:
Functions
-
Generate an alarm condition on the panel.
-
Did panel properly display alarm information?
-
Did NAC (Notification Appliance Circuits) operate on alarm condition?
-
Generate a supervisory condition on the panel.
-
Did panel properly display supervisory information?
-
Generate a trouble condition on the panel.
-
Did panel properly display trouble information?
-
Create an open on a NAC circuit, introduce a ground fault, and remove an initiating device to verify each.
-
Are circuits properly supervised for opens, ground faults, and missing devices?
-
Turn off AC power to verify that panel reports the trouble. After restoring AC power, disconnect the batteries to verify supervision of secondary power. Reconnect batteries and ensure trouble clears.
-
Is incoming power properly supervised?
Lamps and LEDs
-
Do all lamps, LEDs, LCD displays, etc. function?
-
Perform a lamp test on the system.
Battery tests
-
Charger Test: With batteries connected to the panel, check voltage across the batteries with a voltmeter. Voltage SHALL be between 27.36 and 27.84 VDC.
-
Was voltage within acceptable range?
-
Test each battery with the company-provided ELK Battery tester. Result SHALL be greater than 71% of original Reference Reading ((Reference reading - current reading)/Reference reading). If this is a new installation, record Mhos result on the battery label as the Reference Reading.
-
Was the percentage greater than 71%?
-
Mhos of battery on left
-
Voltage of battery on left
-
Mhos of battery on right
-
Voltage of battery on right
Annunciator Operation
-
Verify operation of remote annunciators.
-
Did annunciators function properly?
Initiating Devices
-
Test all initiating devices. While performing this portion of the inspection, verify required life safety functions (i.e. air handler shutdown, door holder release, elevator recall, magnetic locks release, etc.).
-
Did all initiating devices function properly?
-
Did required life safety functions operate properly?
Notification Appliances
-
While system is in an alarm condition, and NOT silenced, check operation of all notification appliances.
-
Did all notification appliances function properly?
Off Premise Transmission
-
Central Station Account Number
-
Were alarm signals received at Central Station?
-
Were supervisory signals received at Central Station?
-
Were trouble signals received at Central Station?
-
Were all restoral signals received at Central Station?
Photos of Documentation and Panel
-
Take photos of all pages of completed, SIGNED Test and Inspection Form and attach. Take photo of panel displaying System Normal at conclusion of inspection (ensure that Inspection sticker is visible in photo). Attach photos documenting any deficiencies.