Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add media
-
Add signature
1.0 Sort - No unnecessary items in the area
-
1.1 No loading/unloading/CIP hoses, tools, pipes on the floor. Hoses capped if not in use .
2.0 Set - A place for everything
-
2.1 All fixed pipe work, tanks, conduit etc. are labelled to indicate contents.
-
2.2 All chemical containers stored and labelled correctly.
-
2.3 All walkways, safety zones (emergency showers, exits, fire equipment etc.) are clearly signed and are not obstructed.
3.0 Shine - clean workplace and equipment
-
3.1 Area is clean, free from rubbish, excessive odours, or debris blocking drains.
-
3.2 Unloading / CIP hoses are free from splits and excessive wear
-
3.3 No juice pooling on floors. No leaking water sources.
-
3.4 Hand washing facilities, soap, paper towel and a bin is available.
-
3.5 All soaking baths are clean, all rubbers are removed, and parts fully submerged.
4.0 Standardise - compliance to standards
-
4.1 Tanker drivers neat and tidy, and wearing safety glasses
-
4.2 Pest control is in place and there is no evidence of pests
-
4.3 All lights are covered and operational
-
4.4 No crates or product containers are being used for any purpose other than designated
-
4.5 All open product pipes to be blanked off
-
4.6 All records are current, legible and signed
-
4.7 No obsolete or uncontrolled documents (process documents, notices etc.) in the area
5.0 Sustain - Maintain standards (only answer the following questions if an area has been 5Sd, otherwise mark N/A)
-
5.1 The audit roster is posted, current, assigned to individual team members, and signed off.
-
5.2 The audit result is posted and current.
-
5.3 The area map is posted and current.
-
5.4 All 5S Area Standard/s are posted and current.
Waste Observation
-
Are any wastes observed? Please specify location and describe the waste.<br>Example: leaking taps, milk drained to floor.....etc
-
Describe the corrective actions required.