Title Page
-
Conducted on
-
Prepared by
-
Project #
-
Location
-
Fieldflo complete and signed off
-
Required paperwork in place from general contractor
-
Heavy equipment checklist complete
-
Lift inspection checklist complete
-
SDS on site
-
Emergency numbers in Fieldflo
Job site perimeter
-
Controlled access zone is large enough for equipment used with line tags as needed
General safety
-
Adequate light level in work area
-
Temporary lights are safely installed and guarded
-
Emergency access is maintained
-
Shafts, floor holes, and slab edges are guarded
-
100% use of hard hat and eye protection
-
Fall arrest or restraint properly used
-
Hearing, feet, hands, faces, arms, and other parts protected
-
Toilet facilities adequate
-
Drinking water available
-
First aid kits and eye wash stations
-
All containers are clearly marked and labeled
-
Hand tools
-
Power tools and cords inspected and have proper guards in place
-
Proper pressures and safeguards for pneumatic tools
-
GFCI used and cords have grounds
-
Electric panels are clearly marked
-
Silica controlled using OSHA table 1 standard
-
Fire extinguishers have annual and monthly signature
-
Work area is kept in clean orderly condition
Cranes and rigging
-
Crane operator has certification
-
Trained rigger and signalman
-
Counterweight and swing radius is protected
-
Safety features are in place and functioning
-
Rigging has been inspected before every use and is tagged and marked as required
-
Hooks on rigging and crane have keepers in place and functioning
Ladders
-
Ladder inspection
-
Ladder has proper labeling
-
Ladder is at proper angle, 3' above landing, tied off, and is used properly
Confined Space
-
Proper signage
-
Written plan and documented training
-
Proper permits and enforced
-
Adequate rescue measure available
-
Testing equipment calibrated and used
Compressors and generators
-
Exhaust issues addressed
-
Safety features and safeguard requirements verified(grounding)
Utilities marking, LOTO, and air gapping
-
Area and subgrade is free of electrical, mechanical, gas, ect.
-
Area has been marked for utilities and X rayed if needed
-
If LOTO is used follow procedure fully
Worker safety training
-
Weekly toolbox talks
-
New worker orientations complete
-
Employees trained to task being performed
Other
-
Other
-
Other
-
Other