Title Page
-
Project
-
Section Number
- Section 1
- Section 2
- Section 3
- Section 4
- Section 5
- Section 6
- Section 7
- Section 8
- Section 9
- Section 10
- Section 11
- Section 12
- Section 13
- Section 14
- Section 15
- Section 16
- Section 17
- Section 18
- Section 19
- Section 20
- Section 21
- Section 22
- Section 23
- Section 24
- Section 25
- Section 26
-
Circuit Number
-
Category Number
-
HDD Number?
-
Rig Number?
-
Crew Number?
-
Crossing Type
-
Chainage
-
Conducted on
-
Prepared by
-
Location
Drilling Inspections
-
Are you working to the latest Approved Drawing Revision?
-
Take a Photo of the Drawings Title Block.
-
Murphy's representative signature to confirm correct information is being worked to
-
Do you have a copy of the signed crossing agreements?
-
Are control measures in place as per the RAMS & IRP Plan?
-
Is there a Bentonite breakout contingency plan in place?
-
Has the area been segregated/ demarcated?
-
(DE W1) what are the Co-ordinates for the Entry/ Exit Pits?
-
(DE W2) Do you have the correct equipment for this work?
-
(DE W3) Survey tool/ Sonde Calibration in date?
-
Have existing services been scanned & marked on the ground?
-
Drill Head Size?
-
What is/ are the Service Crossing Numbers?
-
Have the Pre-Drilling & mud system checks been completed?
-
Comms Equipment working & in good order?
-
Signed on Behalf of Eco- Drill to confirm pre-checks complete
-
(Optional) Signed on Behalf of Dong Energy to confirm Pre-Checks complete
-
(Optional) Signed by 3rd Party Asset Owner Representative?
-
comments by 3rd party witness
-
(DE W4) Confirm each stage/ Rod drilled as per programme?
-
If yes continue, If NO please state reasons, stop & communicate to Dong Energy.
-
Drilling Parameters Pull/ Push/ Torque/ Pressure/ Flow
-
(DE W5) Is the Drill as Per Profile?
-
(DE W6) Record Real time mud properties, weights, viscosity & yield point
-
Record mud additives.
-
Solid Removal as Expected?
-
What is the Start, End Co-ordinates & Maximum Vertical Depth over section?
-
What is the minimum Circuit separation across the length of the drill?
-
What is the maximum hole size reamed pre-duct installation?
-
Did a Bentonite break-out occur?
-
If yes, What Chainage & Depth & how much fluid was lost?
Reamer Data
-
What was the previous Hole Size
-
What is the Reamer Size?
-
Number of Reamers?
-
Type of Reamer?
-
Has the Survey Sonde been used?
-
Start Date & Time
-
End Date & Time
-
Pull Force
-
Push Force
-
RPM?
-
Torque?
-
Pump PSI?
-
Pump Volume GPM?
-
Mud WT (sg or ppg)
-
Comments
- Stuck
- Pack Off
- Lost Circ
Duct Installation
-
What size duct & SDR is being installed?
-
What Size Fibre Optic Duct has been installed?
-
(DE W7) Have the Duct Welds, Beads been inspected & CCTV recorded?
-
Does the pulling head configuration match the Duct?
-
What is the Post run calculated pulling force for the duct?
-
What is the Maximum recomended duct pulling force?
-
What is the maximum recorded duct pulling force?
-
Did it exceed the maximum duct pulling specification?
-
Has the Duct been cleaned?
-
Signed on Behalf of Eco-Drill
-
Comments
-
(Optional) Signed on Behalf of Dong Energy
-
Comments & which items have been witnessed
-
(Optional) 3rd Party asset owner representative Signature
-
Comments by 3rd Party Asset Owner Representative
-
Has a communication line been installed?
-
Has the Phasing been identified on BOTH of the Duct Ends?
-
Take a Photo showing Phase Identification on BOTH Sides
-
Has the Duct been capped at both ends?
-
Take a Photo of the Capped Ducts on BOTH SIDES.
-
(DE H1) Has the duct been buried and GPS Co-ordinates recorded?
-
What are the GPS Co-ordinates & at what depth are they buried?
-
Has the inter site been reinstated & left in a safe condition?
-
Take a photo of the area.
-
Take a photo of the completed F118 Form
-
Take a Photo of the F120 Form
-
General Comments & Lessons Learnt?