Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add signature
Site Office & File
On Display
-
F10 on display?
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
Emergency first aid details
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
HSE Poster
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
Employers liability insurance
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
Public liability insurance
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
Comments
-
Photos
Records on Site
-
Construction Phase Plan
-
RAMS
-
Competence records
-
Signing in Book
-
Induction records
-
Tool box talks
-
Accident book
-
Fire Plan
-
Comments
Fire Plan and Emergency Procedures
-
Fire Plan displayed
-
Escape routes clear
-
Assembly points identified
-
Evacuation procedures adequate
-
Fire Marshall identified
-
First aider identified
-
Means if raising the alarm
-
Signage adequate
-
Lighting adequate
-
Flammable stored appropriately
-
Smoking prohibited on site
-
Safe waste removal / procedures in place to reduce flammables on site
-
Comments
COSHH
-
Harmful substances identified
-
Safe working practices adhered to
-
Correct storage
-
COSHH assessments on record
-
Data sheets on record
-
Comments
PTW
Permit to Work
-
Permit to work required
-
Records retained on site
-
Comments
Segregation
Segregation
-
Are works adequately segregated
-
Method of segregation on site
-
Adequate warning signage on site
-
Comments
-
Photos
Welfare & FA
Welfare Facilities
-
Wash basins present
-
WCs present
-
No of WCs in relation to operatives / visitors on site
-
Resting facilities
-
Provision to fresh air
-
Suitable temperature and weather protection
-
Adequate lighting provisions
-
Comments
-
Photos
First Aid
-
Trained first aider
-
Provision of first aid on site
-
Eyewash facility
-
Comments
Safe Place of Work
-
Working area accessible
-
Stable structure
-
Working area and access adequately lit
-
Comments
-
Photos
PPE
PPE
-
PPE worn when required
-
Addition PPE requirements
-
Comments
-
Photos
Working Practices
Manual Handling
-
MH Assessments adhered to
-
Mechanical alternatives used
-
Comments
-
Photos
Ladders
-
Ladders utilised at time of visit
-
Ladders in good condition?
-
Slip prevention present
-
Is there adequate height above landing place?
-
Prevention of overreaching?
-
Is the ladder resting against a solid surface?
-
Comments
-
Photos
Electrical Safety
-
Maximum supply of 110v
-
Trip / RCD devices
-
Cables and leads in good condition
-
Trailing cables protected
-
Testing and maintained procedures in place
-
Isolation of supply when rquired
-
Competence of operatives
-
Commissioning procedures in place
-
Comments
-
Photos
Plant & Machinery
-
Guards / barriers
-
Supervision where required
-
Inspection and maintenance records
-
Comments
-
Photos
Noise
-
Exposure control
-
Reduction at source
-
Hearing defenders
-
Comments
Vibration
-
Vibration present on project?
-
Recording
-
Trigger times identified
-
Comments
Traffic and Vehicles
Vehicular movement on site
-
Vehicular movements part of project?
-
Suitable routing of traffic
-
One way systems
-
Reversing areas
-
Speed limits
-
Pedestrian routes and crossing points where required
-
Banks men
-
Vehicles maintained and records held
-
Comments
-
Photos
Asbestos
Asbestos
-
Is asbestos present in the premises?
-
Is asbestos present in the working areas?
-
Management procedure in place?
-
Asbestos details covered in induction?
-
Photos
-
Comments
Work at Height
Scaffold
-
Scaffold present on site
-
Scaffold design correct
-
Pull out testing
-
Anchor points
-
Guard rails suitable
-
Temporary removable guardrails
-
Netting required
-
Toe boards suitable
-
Materials evenly distributed
-
Platforms clean and fee from debris
-
Have 7 day inspections been undertaken?
-
Inspection records kept
-
Scaffold tags present
-
Out of use signage where required
-
Safe access / egress
-
Ladders secured
-
4:1 angle
-
Projection of ladder
-
Comments
-
Photos
Scaffold towers
-
Scaffold towers utilised
-
Wheels locked
-
Correct assembly
-
Operatives PASMA qualified
-
Stable ground
-
Guard rails
-
Toe boards
-
Comments
-
Photos
Mobile Elevating Working Platforms
-
MEWPs on site?
-
Stable ground
-
Operator competence (IPAF)
-
SWLs known / displayed
-
Correct use
-
Inspection records
-
Comments
-
Photos
Roof work
-
Is roof working part of the project?
-
Fragile roofs applicable
-
People below fragile roof?
-
Have weather conditions been considered?
-
Harnesses required?
-
Worn?
-
Safety nets required?
-
Installed?
-
Comments
-
Photos
Lifting Equipment
-
Lifting equipment on site
-
12 month testing
-
Lifting plan
-
Supervised activities
-
Appointed person
-
Signaller where required
-
Comments
-
Photos
Excavations and Groundwork
-
Ground works part of the project?
-
Excavations part of the project?
-
Shoring (excavations over 1200mm)
-
Propping (excavations over 1200mm)
-
Boring (excavations over 1200mm)
-
Pumping (excavations less than 800mm)
-
Ventilation (excavations less than 800mm)
-
Drainage (excavations less than 800mm)
-
Stop blocks
-
Signage
-
Permits to work
-
Barriers
-
Emergency rescue
-
Comments
-
Photos
Final page
-
Other images
-
Post site visit comments
-
Signature of Site Manager