Information

  • Audit Title

  • Client

  • Conducted on

  • Prepared by

  • Location
  • Site Manager

  • Contracts Manager

Previous Audit Report

  • Has the previous audit report been closed out and all previous actions cleared?

Site Set up

  • Are the following items displayed?

  • Health & Safety Law poster (what you should know) / Latest HSE Policies / Insurance Policy / Accident reporting process / Emergency plan and contacts / Fire Plan / No Smoking signs / Assembly point signs / First aid location signs / Registration under the Hazardous Waste Regulations / Signs for doors and cabins?

  • Have appropriate signs / notices been erected around the site i.e., mandatory use of PPE, No Smoking, Traffic Management, Fire assembly, Fist Aid Points etc?

Trained & Competent Compliance

  • Ensure all site operatives, including sub-contractors have a valid CSCS/CPCS/NPORS cards?

  • All RR staff completed company and client induction / All visitors including the client representatives being inducted / All RR staff received RAMS briefings for the works being undertaken?

Weekly Inspection Report – Lift and Work Equipment

  • Evidence of Work and Lift equipment checks being completed at time of audit

  • All lifting equipment visually ok at time of audit walk around with the Foreman

Workplace Transport & Mobile Plant

  • Excavators on site at time of audit. Had the weekly inspections completed by the Excavator Operators and the Foreman

  • Dumpers on site had the weekly checks completed by the Foreman at time of the Audit.

  • Rollers on site had the weekly checks completed by the Foreman at time of the Audit.

  • Ramex on site had the weekly checks completed by the Foreman at time of the Audit.

  • Telehandler on site had the weekly checks completed by the Foreman at time of the Audit.

  • Moxy on site had the weekly checks completed by the Foreman at time of the Audit.

  • Block Grab was on a Pack of Blocks at time of the Audit.

  • All Bucket change areas were fenced off on all 4 sides with the correct signage in place at time of the audit.

Excavations

  • Permit to digs are being completed by Site Agent and were in place at time of the audit

  • Permits to break ground are valid and have been checked and reviewed prior to issue to ensure the appropriate controls have been included. At least one trained CAT & Genny operative named on the permit. All contractors are working in accordance with permits to break ground. Old permits have been cancelled and closed.

  • Are completed Permits compliant?

  • All Deep Excavations are fenced off and secure at time of the audit with Hears panels all double clipped and signage in place.

  • All Service Trenches were fenced off and secure at time of the audit.

Working Habits

  • All RR Operatives on site at time of the audit had signed in the relevant office.

  • All RR Operatives where found to be wearing the correct PPE/RPE at time of the audit.

  • All RR working areas clean and tidy at time of the audit.

  • All Bricklayers on site at time of the audit had signed in and were wearing the correct PPE/RPE

  • Signage in place for spoil heaps and no sheer face on spoil heaps at time of audit.

Access, Storage & Housekeeping.

  • Site Entrance was clear with signage with signage in place and a holding point for delivery lorries.

  • Light materials storage area clean and tidy at time of audit

  • Heavy materials storage area clean and tidy at time of audit

  • Pedestrian walkways in place at various locations of the site with crossing points

  • Perimeter fence all in place and secure at time of audit

Security/Public Protection

  • Site is securely fenced at all times to prevent unauthorised access / Suitable barriers and warning notices to keep members of the public separated from the site works and site traffic / Manhole lids protected and screwed down / Approach roads are kept clean and tidy, and any debris is removed promptly / Deliveries timed so as to avoid school drop-off and pick-up times and other rush hour times / Approaches to the site are kept clear of site traffic / Local residents informed of our works / Letter drops?

  • Out of hours security in place?

  • Security/Public Protection Compliant?

Welfare Facilities

  • Welfare setup is supplied and maintained by the PC and at time of the audit was clean and tidy

  • Hot and cold running water in toilet block and canteen

  • Drying Room, Canteen, And RR officer were also clean and tidy at time of the audit

  • Welfare Facilities Compliant?

Environmental Issues

  • Refuelling area set out in the secure container with signage in place at time of audit.

  • Spill kit present at time of the audit

  • Drip tray present at time of the audit

  • Ad- Blue was in drums at time of audit which was locked away with the bowser

  • Mixer on site at time of the audit with fence all around and secure

  • 2 Packs of blocks at the front of the mixer in place at time of the audit

  • Wheels were wrapped at time of the audit to prevent cross contamination

  • Signage was in place at time of the audit to advice user what PPE is required whilst in use

  • All Environmental Issues Compliant

First Aid

  • First aid kits were on site at time of the audit

  • Eye Wash is available on site if needed at time of the audit

  • Designated First Aiders on site at time of the audit.

  • First Aid Books available and in the site office at time of audit.

  • Nearest Hospital visible on the HSEQ notice Board.

  • First Aid Compliant?

Fire

  • Fire extinguishers present around the site at time of the audit at various locations

  • Fire Assembly Point in place with signage visible

  • Fire Compliant?

H.A.V.S

  • HAV’s record was being completed and up to date at time of audit

  • HAVS Compliant?

Safety Management

  • At time of audit all operatives onsite had signed the RAMS to state that they had read and understood the SSOW

  • Plant arrivals completed for all plant on site at time of audit

  • Quick hitch check sheets complete and up to date at time of audit

  • Excavation inspections being completed and all up to date

  • All site inductions up to date at time of the audit

  • Weekly Tool Box Talks all completed and up to date at time of audit.

  • Safety Management Compliant

Control of Substances Hazardous to Health (COSHH)

  • COSSH Assessments carried out for all potentially hazardous materials/substances being used / MSDS sheets available / COSHH Assessments briefed / Clearly marked/identified/storage / Appropriate control measures in place / PPE provided and used?

  • COSHH Compliant?

Summary

  • undefined

Audit Risk Level

  • Risk rating for this Audit.

Sign off

  • I confirm I have had the contents of this audit report explained to me.

  • Foreman:

  • Person conducting this Audit:

  • Audit concluded at:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.