Information
-
Audit Title
-
Client
-
Conducted on
-
Prepared by
-
Location
-
Site Manager
-
Contracts Manager
Previous Audit Report
-
Has the previous audit report been closed out and all previous actions cleared?
Site Set up
-
Are the following items displayed?
-
Health & Safety Law poster (what you should know) / Latest HSE Policies / Insurance Policy / Accident reporting process / Emergency plan and contacts / Fire Plan / No Smoking signs / Assembly point signs / First aid location signs / Registration under the Hazardous Waste Regulations / Signs for doors and cabins?
-
Have appropriate signs / notices been erected around the site i.e., mandatory use of PPE, No Smoking, Traffic Management, Fire assembly, Fist Aid Points etc?
Trained & Competent Compliance
-
Ensure all site operatives, including sub-contractors have a valid CSCS/CPCS/NPORS cards?
-
All RR staff completed company and client induction / All visitors including the client representatives being inducted / All RR staff received RAMS briefings for the works being undertaken?
Weekly Inspection Report – Lift and Work Equipment
-
Evidence of Work and Lift equipment checks being completed at time of audit
-
All lifting equipment visually ok at time of audit walk around with the Foreman
Workplace Transport & Mobile Plant
-
Excavators on site at time of audit. Had the weekly inspections completed by the Excavator Operators and the Foreman
-
Dumpers on site had the weekly checks completed by the Foreman at time of the Audit.
-
Rollers on site had the weekly checks completed by the Foreman at time of the Audit.
- Yes
- No
- N/A
-
Ramex on site had the weekly checks completed by the Foreman at time of the Audit.
-
Telehandler on site had the weekly checks completed by the Foreman at time of the Audit.
-
Moxy on site had the weekly checks completed by the Foreman at time of the Audit.
-
Block Grab was on a Pack of Blocks at time of the Audit.
-
All Bucket change areas were fenced off on all 4 sides with the correct signage in place at time of the audit.
Excavations
-
Permit to digs are being completed by Site Agent and were in place at time of the audit
-
Permits to break ground are valid and have been checked and reviewed prior to issue to ensure the appropriate controls have been included. At least one trained CAT & Genny operative named on the permit. All contractors are working in accordance with permits to break ground. Old permits have been cancelled and closed.
-
Are completed Permits compliant?
-
All Deep Excavations are fenced off and secure at time of the audit with Hears panels all double clipped and signage in place.
-
All Service Trenches were fenced off and secure at time of the audit.
Working Habits
-
All RR Operatives on site at time of the audit had signed in the relevant office.
-
All RR Operatives where found to be wearing the correct PPE/RPE at time of the audit.
-
All RR working areas clean and tidy at time of the audit.
-
All Bricklayers on site at time of the audit had signed in and were wearing the correct PPE/RPE
-
Signage in place for spoil heaps and no sheer face on spoil heaps at time of audit.
Access, Storage & Housekeeping.
-
Site Entrance was clear with signage with signage in place and a holding point for delivery lorries.
-
Light materials storage area clean and tidy at time of audit
-
Heavy materials storage area clean and tidy at time of audit
-
Pedestrian walkways in place at various locations of the site with crossing points
-
Perimeter fence all in place and secure at time of audit
Security/Public Protection
-
Site is securely fenced at all times to prevent unauthorised access / Suitable barriers and warning notices to keep members of the public separated from the site works and site traffic / Manhole lids protected and screwed down / Approach roads are kept clean and tidy, and any debris is removed promptly / Deliveries timed so as to avoid school drop-off and pick-up times and other rush hour times / Approaches to the site are kept clear of site traffic / Local residents informed of our works / Letter drops?
-
Out of hours security in place?
-
Security/Public Protection Compliant?
Welfare Facilities
-
Welfare setup is supplied and maintained by the PC and at time of the audit was clean and tidy
-
Hot and cold running water in toilet block and canteen
-
Drying Room, Canteen, And RR officer were also clean and tidy at time of the audit
-
Welfare Facilities Compliant?
Environmental Issues
-
Refuelling area set out in the secure container with signage in place at time of audit.
-
Spill kit present at time of the audit
-
Drip tray present at time of the audit
-
Ad- Blue was in drums at time of audit which was locked away with the bowser
-
Mixer on site at time of the audit with fence all around and secure
-
2 Packs of blocks at the front of the mixer in place at time of the audit
-
Wheels were wrapped at time of the audit to prevent cross contamination
-
Signage was in place at time of the audit to advice user what PPE is required whilst in use
-
All Environmental Issues Compliant
First Aid
-
First aid kits were on site at time of the audit
-
Eye Wash is available on site if needed at time of the audit
-
Designated First Aiders on site at time of the audit.
-
First Aid Books available and in the site office at time of audit.
-
Nearest Hospital visible on the HSEQ notice Board.
-
First Aid Compliant?
Fire
-
Fire extinguishers present around the site at time of the audit at various locations
-
Fire Assembly Point in place with signage visible
-
Fire Compliant?
H.A.V.S
-
HAV’s record was being completed and up to date at time of audit
-
HAVS Compliant?
Safety Management
-
At time of audit all operatives onsite had signed the RAMS to state that they had read and understood the SSOW
-
Plant arrivals completed for all plant on site at time of audit
-
Quick hitch check sheets complete and up to date at time of audit
-
Excavation inspections being completed and all up to date
-
All site inductions up to date at time of the audit
-
Weekly Tool Box Talks all completed and up to date at time of audit.
-
Safety Management Compliant
Control of Substances Hazardous to Health (COSHH)
-
COSSH Assessments carried out for all potentially hazardous materials/substances being used / MSDS sheets available / COSHH Assessments briefed / Clearly marked/identified/storage / Appropriate control measures in place / PPE provided and used?
-
COSHH Compliant?
Summary
-
undefined
Audit Risk Level
-
Risk rating for this Audit.
Sign off
-
I confirm I have had the contents of this audit report explained to me.
-
Foreman:
-
Person conducting this Audit:
-
Audit concluded at: