Title Page

Heavy Machinery Daily Pre-Start

Pre-Start

  • Machine

  • Date

  • Site

  • Machine Hours

  • Operator

Category A

  • Verbal authorisation from supervisor/mechanic must be obtained before the machine can commence work

  • Hydraulic Oil

  • Engine Oil

  • Transmission Oil

  • Park Brake

  • Fire Extinguisher/s

  • Warning System

  • Water/Coolant

  • Fuel Leaks

  • Oil Leaks

  • Horn

  • Tyres

  • Structural Condition

  • Gauges

  • Water Leaks

  • Guards in Place

  • Two-way Radio

  • Seat

  • Tracks/Track Frame

  • Pins & Retainers

  • Controls

  • Lights

  • Seat Belt

Category B

  • Report to supervisor/mechanic

  • Air Conditioner/Heater

  • Damage

  • Windows Clean and Clear

  • Greased Day Before

  • Grease Lines

  • Fuel Level

  • Radio AM/FM

  • Wipers & Washers

  • Cab is Clean

Category C

  • Comments

  • Other Faults

  • Other Damage

Supervisor/Mechanic Sign Off

  • Add signature

MACHINE MUST BE RUN AT LOW IDLE & WARMED UP FOR AT LEAST 5 MINUTES BEFORE COMMENCING WORK AND BEFORE TURNING MACHINE OFF

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.