Title Page
-
Client / Site
-
Add location
-
Select date
-
Location of Lockout/Tagout Equipment
-
Picture of LOTO Equipment
-
Name of Equipment
-
Location of Equipment Being Controlled
-
Photo of Equipment Being Controlled
-
Picture of Equipment Start/Stop
-
Location of Energy Control Panel
-
Picture of Energy Control Panel
-
Voltage Associate with Energy Control Panel
Authorization: Only employees trained in the lockout procedures for the above Equipment and having received thorough indoctrination in the facilities lockout/tagout procedures may work in this equipment.
Purpose of Lockout
-
General
-
Inspection
-
Cleaning
-
Other
Energy Sources to be Considered
-
Electrical
-
Fuel Gasses
-
Fuel Oil
-
Steam
-
Compressed Air
-
Hydraulic
-
Chemical
-
Gravity
-
Spring Tension
-
Other
To secure: -NOTIFY ALL AFFECTED EMPLOYEES that application of lockout/tagout devices will be applied to this machine. -SHUT DOWN MACHINE USING NORMAL SHUTDOWN PROCEDURES -APPLY LOCKOUT/TAGOUT DEVICE AS FOLLOWS:
-
Photos of where Lockout/Tagout Devices are to be applied.
-
Lockout/Tagout Procedure
Step
Test cycle the machine (Push the start button) to insure lockout is applied correctly and/or test circuit, relieve pressure, etc. as required to insure no energy is present.
AFTER WORK IS PERFORMED: -Clear machine or equipment of tools and materials. -Notify all affected employees and remove all tools from equipment area. -Employee(s) that applies the lockout/tagout shall remove the device(s). Start the machine/equipment as follows:
-
Procedure to Start
Step
Return all lockout/tagout devices to the proper storage.
-
Conducted By: