Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
Open System Boiler Change
-
Heelas Heating and Renewables
-
Bayworth Chapel, Brumcombe Lane, Bayworth Oxon OX13 6QU www.heelasheating.co.uk dan.heelas@heelasheating.co.uk Office: 0844 8001682
-
Technical Survey Form
-
Boiler Change Open System Boiler
-
Customer Details:
-
First Name:
-
Date:
-
Job Number:
-
Last Name:
-
Home Contact Number:
-
Address:
-
Other Contact Number:
-
Please avoid the following times:
-
Brief Description of Work to be Carried Out:
-
Occupied
-
Unoccupied
-
House
-
Bungalow
-
Flat
-
Please Record any Damage to the Carpets and Flooring, Ceilings, Walls or Other:
-
Customer's Signature:
-
Existing System:
-
* Ensure the Customer Puts System into Full Operation Prior to Your Visit
-
Appliance Make:
-
Boiler / System:
-
Appliance Position:
-
Flue:
-
Fuel Type:
-
Controls:
-
Tick
-
Tick
-
Tick
-
Tick
-
Tick
-
Combination
-
Wall Mounted
-
Open
-
Gas
-
Integral Clock
-
System Boiler
-
Floor Mounted
-
Fanned
-
Oil
-
Room Stat
-
Appliance Model:
-
Open Vented
-
Back Boiler
-
Balanced
-
LPG
-
Trv's
-
Storage Htrs
-
Other
-
Vertex
-
Solid Fuel
-
'S' Plan
-
Fully Pumped
-
Other
-
Electric
-
'Y' Plan
-
Output (Kw):
-
Gravity
-
Other
-
Energy Man
-
Other
-
Zinc or '1' Pipe
-
Cylinder Type:
-
Other
-
New System:
-
Appliance Make:
-
Model:
-
Output:
-
How Far is the Boiler Moving Position?
-
Flue:
-
Gas Supply:
-
Condense:
-
Controls:
Flue Direction:
-
Other Flue Considerations:
-
Upgrade:
-
Run:
-
Arrangement:
-
Tick
-
Tick
-
Tick
-
Tick
-
Tick
-
Tick
-
Integral Timer
-
Wireless?
-
Rear
-
Pitched Tile
-
To:
-
22mm
-
Internal
-
External Timer
-
'S' Plan
-
Side
-
Adj. Pitched Tile
-
28mm
-
External
-
Room T'stat
-
'Y' Plan
-
Vertical
-
Lead Slate
-
Pumped
-
Upgrade Vent/Feed Config?
-
Spacer Kit
-
Flat Roof Kit
-
Soakaway
-
Convert to Fully Pumped?
-
Length of
-
New Trv's
-
L/Shields
-
Length of Flue:
-
Tick
-
ReRun?
-
Distance?
-
Tick
-
Plume Kit:
-
Standard:
-
Any Additional Comments:
-
Tick
-
Length if
-
Qty
-
White Kit
-
Longer:
-
Black Kit
-
Water Supply and Quality:
-
Water Storage
-
Water Treatment:
-
Tick
-
Water Softeners:
-
New Cylinder / Storage Vessel Required?
-
Hot & Cold Flush
-
Full Powerflush
-
NOTE:
-
Manufacturer:
-
Make / Model:
-
Inhibitor
-
Magnaclean
-
Water Softeners are not
-
Scale Reducer
-
Compatible with Aluminium
-
Heat Exchangers; Ensure
-
Size?
-
Litres:
-
Other:
-
Water Supply to the System
-
is UnTreated
-
Type i.e. Unvented:
-
Technical Survey Form
-
Heelas Heating and Renewables
-
Bayworth Chapel, Brumcombe Lane, Bayworth Oxon OX13 6QU www.heelasheating.co.uk dan.heelas@heelasheating.co.uk Office: 0844 8001682
-
Boiler Change Open System Boiler
-
Electrical:
-
Power Supply:
-
Tick
-
Bonding:
-
Is the Existing Power Supply Adequate?
-
Do we need to Fit / Upgrade Mains Equipotential Bonding?
-
Do we need to Fit / Upgrade Supplementary Bonding?
-
Is there a Fused Spur <1m from Boiler Position?
-
Is a New Fused Spur Required?
-
Certification:
-
Is there an Adjacent Immersion Point Present?
-
Part 'P' Required?
-
Is Additional Pump OverRun Wiring Required?
-
Minor Works Certification Required?
-
Electrician:
-
Any Additional Comments:
-
Do we need to Contract the Services
-
of our Electrician?
-
Building Work:
-
Flue Hole:
-
Tick
-
Explain any Other Remedial Work Required e.g. Boxing:
-
Will the Engineer be able to Make Good?
-
Old Flue Holes to be Made Good?
-
Balanced Flue
-
Fanned Flue
-
Builder:
-
Do we need to Contract the Services
-
of our Builder?
-
Asbestos:
-
IMPORTANT
-
If Asbestos or an Appliance Deemed to Contain Asbestos is Suspected, then an 'Asbestos Risk Survey Sheet' must be Completed
-
and Notification to your Line Manager Must be Made
-
If in any Doubt of the Company Procedure, you must Liase with your 'Health and Safety' Advisor Immediately
-
Working at Heights:
-
IMPORTANT
-
Additional Equipment:
-
Tick
-
Any Additional Comments:
-
Ladders
-
Scaffolding
-
Tower
-
Scaffolder:
-
Do we need to Contract the Services
-
of our Scaffolder?
-
* Please use a 'Working at Heights Form'
-
Lifting and Handling:
-
IMPORTANT
-
Additional Person Required:
-
Time:
-
Any Additional Comments:
-
Manual Handling
-
hrs
-
Ladder Work
-
hrs
-
Appliance Handling
-
hrs
-
Vertical Flue Work
-
hrs
-
Does the Primary Engineer have a Sack Truck?
-
Additional Questions:
-
Labour and Waste
-
Can Materials Be Delivered the Day Before Commencement of Works?
-
Estimated Labour Time Prior to Material / Pack Pricing
-
Engineer 1
-
hrs
-
Engineer 2
-
hrs
-
Estimated Total Travel Time
-
Engineer 1
-
hrs
-
Engineer 2
-
hrs
-
Estimated Total Labour Time Prior to Material/Pack Pricing
-
Total
-
hrs
-
Where is the most Convenient Place to Store the Waste until Collection?
-
Surveyor:
-
I have completed a 'Quotation Variation Form' for any shortfalls from the initial sales visit and/or raised a separate job for any other
-
works that will take place at the same time of installation. I have pretreated the central heating system
-
Name:
-
Signature:
-
Date: