Information
-
Civil Contract audit been carried out on
-
Company
- Heneghans
- McLaughlin
- Perfecta
- Heneghan Comms
- ASG
- C&A
- Northfield
-
Supervisor Name
- Marlon Brown
- Steven Pegg
- BartleyKeane
- Dave Bagley
- Daniel Laycock
- Steven Hewkin
- Andrew Siddons
- Steve kemp
- Kris Ogilsby
- Des Rogan
- Sean Delaney
- Jamie Ayrton
- Gary Handley
- Mick Mcelhinney
- Phil Edgell
- John Walsh
- John Whitehead
- Bob Morris
- Rob Austin
- Kevin Murphy
-
NBU / PN Number
-
Cab Number
-
Team Name who Built Cab
-
Street Name
-
Build Area
-
Conducted on
-
Cab Location
Cab Inspection
-
Civil Contract audit been carried out on
-
Please supply a location i.e Footway or Verge of the Cab
-
Is the Cab built to Spec, Root should be between 50mm to 100mm out of Ground.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
Is the Cab bolted down correctly and secure.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Tape provided to seal the Root correctly in place.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Are the ducts entry into cabinet correct i.e in the centre and spaced 40mm apart
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Are the Ducts level and above the concrete by 25mm VIRGIN ONLY. - *City Fibre Ducts should left 50MM below Top of the Cab base and Concrete should be Level*
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the inside of the Cab concreted and level.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the earth strap fitted.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Cab door/lock correct to the cabinet on the Drawing.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Correct amount of Tubes installed and ALL Capped
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
As a Concrete fillet been put round cabinet base (Verge / Flags Only)
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Please supply a location i.e Footway or Verge of the Cab
-
Is the Cab built to Spec, Root should be between 50mm to 100mm out of Ground.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
Is the Cab bolted down correctly and secure.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Tape provided to seal the Root correctly in place.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Are the ducts entry into cabinet correct i.e in the centre and spaced 40mm apart
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Are the Ducts level and above the concrete by 25mm VIRGIN ONLY. - *City Fibre Ducts should left 50MM below Top of the Cab base and Concrete should be Level*
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the inside of the Cab concreted and level.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the earth strap fitted.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Cab door/lock correct to the cabinet on the Drawing.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Correct amount of Tubes installed and ALL Capped
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
As a Concrete fillet been put round cabinet base (Verge / Flags Only)
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Please supply a location i.e Footway or Verge of the Cab
-
Is the Cab built to Spec, Root should be between 50mm to 100mm out of Ground.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
Is the Cab bolted down correctly and secure.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Tape provided to seal the Root correctly in place.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Are the ducts entry into cabinet correct i.e in the centre and spaced 40mm apart
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Are the Ducts level and above the concrete by 25mm VIRGIN ONLY. - *City Fibre Ducts should left 50MM below Top of the Cab base and Concrete should be Level*
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the inside of the Cab concreted and level.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the earth strap fitted.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Cab door/lock correct to the cabinet on the Drawing.
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
Is the Correct amount of Tubes installed and ALL Capped
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
Please take Photo of the Cab once all the work are corrected more than one can be taken
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
-
As a Concrete fillet been put round cabinet base (Verge / Flags Only)
-
Please take Photo of the Cab showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the cab
-
please take a photo showing the Cab as been built correctly an all tubes are in the correct Ducts, more than one can be taken.
Conclusion
-
Add Comments on Findings
-
As the report been completed correctly