Information
-
Civil Contract audit been carried out on.
-
Company Name
- Heneghans
- Perfecta Group
- LDH
- Hardwick
- AMG
- Cusack
- Axel
- SAUK
-
Team Name
-
Person carrying out compliance audit
- Daniel Laycock
- Leah Jones
- Andrew Siddons
- Gary Newton
- Jacob Leeming
- Steven Hewkin
- Chris Lockham
- Steve Kemp
- Jamie Ayrton
- Kevin Murphy
- Des Rogan
- Sean Delaney
- Diogo Santos
- John Walsh
- Phil Edgell
- Mick Mcelhinney
- Rob Austin
- John Whitehead
- Gary Handley
- Bob Morris
- Ben Moody
- Chris Gunn
-
Conducted on
-
Location
-
Build Area
Daily Site Condition Check
Works Contract
-
Civil Contract audit been carried out on.
SLG on Site.
-
NRSWA (Street Works Card) On-Site
-
Please take Photo of Proof
-
Do the Team have a copy of the Permit Condition On-site.
-
Please take photo of proof
-
SLG / Site Setup asper the Permit Condition.
-
Please take photo of proof
-
As a Daily Site Risk Assessment been completed (Have you signed on)
-
Please take Photo of Proof
-
Are ALL permit boards been displayed at both ends of the work site and have the correct Permit Numbers for the street they are working on
-
Please take photo of proof - ALL PERMIT BOARDS AND PERMIT NUMBERS
-
Are Men @ work, Road Narrow and Blue arrows Signs out and Correct. (Require cones if on the road).
-
Please take photo of proof
-
Sideway Safety Zone In place and Correct distance from Barriers
-
Please take photo of proof
-
Are all Barriers set up correctly as per the red Book, (Clipped Together)
-
Please take photo of proof
-
Is there a walkway in place and set up correctly - (MINIMUM 1M WIDE WALKWAY - MEASURED FROM BARRIER FOOT TO OPP FOOT)
-
Please take photo of proof
-
Are Walk Boards / T-Mats on Site & all Secured (Walk Boards with Rubber edges don't require securing but ground condition may require them securing. Take this in consideration when answering this question).
-
Please take photo of proof - (MORE THAN ONE CAN BE TAKEN)
-
Are Kerb ramps or Drop Kerbs fit for purpose & Secured
-
Please take photo of proof - (MORE THAN ONE CAN BE TAKEN)
Traffic Management
-
T.M - set up correctly signs / lights.
-
Please take photo of proof
House Keeping
-
Is ALL appropriate Material stored within Barriers
-
Please take photo of proof
Other Site Failures
-
Is there any other site failings.
-
Please take photo of proof
SLG on Site.
-
NRSWA (Street Works Card) On-Site
-
Please take photo of proof
-
Do the Team have a copy of the Permit Condition On-site.
-
Please take Photo of Proof
-
SLG / Site Setup asper the Permit Condition
-
Please take Photo of Proof
-
As a Daily Site Risk Assessment been completed (Have you signed on)
-
Please take photo of proof.
-
Are ALL permit boards been displayed at both ends of the work site and have the correct Permit Numbers for the street they are working on
-
Please take photo of proof - ALL PERMIT BOARDS AND PERMIT NUMBERS
-
Are Men @ work, Road Narrow and Blue arrows Signs out and Correct. (Require cones if on the road).
-
Please take photo of proof
-
Sideway Safety Zone In place and Correct distance from Barriers
-
Please take photo of proof
-
Are all Barriers set up correctly as per the red Book, (Clipped Together)
-
Please take photo of proof
-
Is there a walkway in place and set up correctly - (MINIMUM 1M WIDE WALKWAY - MEASURED FROM BARRIER FOOT TO OPP FOOT)
-
Please take photo of proof
-
Are Walk Boards / T-Mats on site & all Secured.
-
Please take photo of proof - (MORE THAN ONE CAN BE TAKEN)
-
Are Kerb ramps or Drop Kerbs been used & Secured
-
Please take photo of proof - (MORE THAN ONE CAN BE TAKEN)
Traffic Management
-
T.M - set up correctly signs / lights.
-
Please take photo of proof
House Keeping
-
Is ALL appropriate Material stored within Barriers
-
Please take photo of proof
Other Site Failures
-
Is there any other site failings.
-
Please take photo of proof
Conclusion
-
Please supply a quick description of any findings of the workplace inspection.
-
Supervisor Signature
-
Is the Audit Complete