Title Page
-
Conducted on
-
Prepared by
-
Location
-
Check that materials meet the specification and requirements.
-
Check correct specification has been used including finishing schedule.
-
Check correct storage of materials.
-
Check material batch numbers (same for individual area).
-
Check surface quality/preparation of wall substrate is acceptable.
-
Check opacity of wall coatings (sufficient number of coats)
-
Check preparation of timber finishings is acceptable
-
Check coverage of coatings on timber is acceptable (correct number of coats)
-
Confirm walls and finishings are free from marks/scuffs and room/area is ready for handover.
Untitled page
-
Henderson Supervisor
-
RCG Site Manager
-
Inspection/Handover Date