Title Page

  • Conducted on

  • Prepared by

  • Location
  • Check that materials meet the specification and requirements.

  • Check correct specification has been used including finishing schedule.

  • Check correct storage of materials.

  • Check material batch numbers (same for individual area).

  • Check surface quality/preparation of wall substrate is acceptable.

  • Check opacity of wall coatings (sufficient number of coats)

  • Check preparation of timber finishings is acceptable

  • Check coverage of coatings on timber is acceptable (correct number of coats)

  • Confirm walls and finishings are free from marks/scuffs and room/area is ready for handover.

Untitled page

  • Henderson Supervisor

  • RCG Site Manager

  • Inspection/Handover Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.