Title Page
-
Site conducted
Site Location and Personal
-
Site Location
-
Date
-
Work Order and PO Number
-
Supervisor Conducting Safety Talk ?
-
Personal Attending the Safety Talk ?
-
Work Site Safety Hazards
-
Job Site Description of work being preformed
-
Has the SDS Reviewed and discussed with all team members.
Confined Space Equipment
-
Is this a Permit Required Confined Space ?
-
Has a proper barricade been placed around the confined space to prevent other contractors from entering the area of our confined space ?
-
Has Lock out Tag Out (LOTO) been completed and all members of the confined space locked out with personal locks?
-
Dose the plant have a Confined Space Permit for us to fallow.
-
Has Permit been filled out and signed by entrant and attendant?
-
Have all hazards inside the confined space been identified and properly eliminated.
-
Equipment Required for Confined Space
-
MSA air monitoring Serial Number
-
Calibration Date
-
Fresh Air Calibration been completed
-
Is the confined space a vertical or horizonal entry?
-
What type of space is the confined space ?
-
Has the confined space been ventilated ?
Repertory protections
-
Is Respiratory Protection Required
-
Full Face MSA
-
Half Face MSA
-
GME Filter
-
GMC Filter
-
GMD Filter
-
GmA Filter
-
P-100 Filter
-
N-95 Particulate Filter
-
SCBA
-
Supplied Air W/5-Minute Egress bottle
-
Are Employee Respiratory Fit Tested and up to date ?
PPE Required
-
Is Fall protection Required
-
PPE Required for this project.
-
Are Cut Resistance Gloves Required
-
Are personal air monitors required ?
-
Are Escape Respirators Required ?
-
Any Special PPE Required
Water Blast Equipment and Safety
-
Has all equipment pre trips been completed before startup?
-
What type of work is being preformed ?
-
Has all hoses and equipment been inspected and flushed before use.
-
Dose the water supply have adequate pressure and volume to supply the pump that will be in use?
-
Do you have barricades tape and tags barriers in place?
-
Have all whip checks been installed on the hoses
-
What equipment will be used in this project.
-
What PPE is Required for this project?
-
Have all hoses been secure and tied back to prevent falling or trip hazards?
Vacuum Work
-
What type of equipment is needed for this project?
-
What type of space is the vacuum work being completed in?
-
What Type of Hose is needed for this project?
-
Bonding and Grounding
-
Has all hoses been tied back to prevent hazards?
-
Has Pre-Trip been completed before startup?
-
Has proper barricade Tape and Tags been placed for trip and fall hazards?
Sign Off Of Personal for Safety Talk
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
-
I have attended the tool box safety talk with my supervisor and have read and acknowledge that I fully understand the Hazards and have been informed of the appropriate PPE and steps that need to be taken to prevent personal and team injuries due to the hazards on this project. I also understand that I have the right to voice my concerns of any and all hazards.
Scaffolding Work
-
Safety Hazards Onsite
-
Scaffolding Work
-
Is Scaffolding Tagged
-
What Color Tag is posted on the scaffolding
-
Inspection Date on Tag
-
Required Fall Protection
Ladder Safety Requirements
-
Extension Ladder
-
Length of the ladder
-
Are Fall Protection Required
-
What Fall protection is required
-
Will the work task be preformed on the ladder
-
Was the Ladder inspected before use ?
-
Picture of the inspection tag and who preformed the inspection
-
Step Ladder Height
-
Is overhead electric present ?
-
Has Barricades been set up around the ladder work area?