Information
-
Location
-
Supervisor/Crew Leader
-
Job description
-
Conducted on
-
Prepared by
-
Personnel
Work order
-
Tailgate safety topic is specific to the job performed?
-
JHSA signed by all crew members?
-
Pre job inspection done on equipment/vehicles?
Safety controls
-
Crew is aware of all hazards and how to avoid them?
-
LOTO done correctly?
-
MSDS SHEETS CORRECT
-
Is Respiratory Protection Required ?
-
All permits filled out correctly (Confined Space etc) ?
-
Is Job in Confined space ?
-
Has confined space air quality been tested?
-
All PPE present and properly used ?
-
Are ladders, scaffold, fall protection in use ?
-
Are the ladders, scaffolds, man lifts and fall protection being properly used ?
Hydroblasting General Safe Work Practices
-
4.2.2 house keeping-Is the work area free of all removable hazards?
-
4.2.4 Is pump properly barricaded to restrict unauthorized people from entering the work area.
-
4.2.4 is area being cleaned properly barricaded to prevent unauthorized people from entering?
-
4.2.4 is pre-printed barricade tags properly attached (Danger hydroblasting)
-
4.2.5 Are wheel chocks in place on pump and truck ?
-
4.2.6. Whip checks in place ?
-
4.2.7 Is pump operator present and close enough to disengage pressure ?
-
4.2.8 Is there clear line of site between pump operator and hose end equipment operator. If unable to do so is radio or third person in use ?
-
4.2.9 Are hoses routed and protected in a manner that prevents vehicular damage and personnel exposure to hoses ?
-
4.2.10 Are all personnel 6' or more away from hose connections while under pressure?
-
4.2.12 Are debris barriers in place ?
-
4.2.13 Is pump grounded ?
-
4.2.14 Is anti-withdrawal device in use and mounted securely ?
-
4.2.15 Is a hard stop required. If so is it being utilized ?
-
4.2.17 Is hose shroud in place ?
-
4.2.18 Are Face Shields being properly used ?
-
4.2.19 Is operator controlling the foot pedal or pneumatic controls ?
-
4.2.19 Is foot pedal secure and free from obstruction ?
Hydroblasting Equipment Requirements
-
4.3.4 is stinger at least 1.5x the diameter of pipe being cleaned
-
4.2.5 Is lance marked 24"or more from the end of the compression fitting ?
-
4.3.6 Does shotgun have hose shroud ?
-
4.3.6 Is the shotgun shroud 6' in length ?
-
4.3.6 Has shotgun shroud been properly inspected ?
-
4.3.7 Is the length of the shotgun 52" from butt stock to end of the nozzle
-
4.3.8 Are fittings rated for pressure being applied?
-
4.3.9 Has Dump valve on the shotgun been inspected ?
-
4.3.10 Is entry point where 3D tool is in operation securely covered to prevent spray from exiting vessel
-
4.3.10 Is 3D tool appropriately suspended (rope not allowed)
-
Have Boiler wash tools been tied back and tied down secure ?
-
Blast hose in good repair
-
Have Blast Hoses been properly tied and secured and whip checks in place?
-
10k
-
15K
-
20k
-
40K
-
8k High Volume
-
10K High Volume
Vacuuming
-
Is job on an elevated floor?
-
Is vac hose properly tied off?
-
Is there a hose break (Safety-T )in use?
-
If necessary, is vac truck and hose properly bonded and grounded ?
-
Has hoses been properly inspected to prevent leaks and spills?
Vehicle/equipment
-
Is fire extinguisher in place and inspected?
-
Are vehicle/equipment clean and free from trash?
Comments and corrections
Observations
-
undefined
Corrective Action
-
undefined
-
Auditor
-
Crew Leader/Supervisor