Audit

Initial Tap Findings
Tap Before Photo
Tap Reading Photo

High Frequency 743 MHz Tap Reading

Tap After Photo

Was Professional Traffic Control required on site (ZZ-2c)?

Sequence Number

Have you provided your Traffic Control Quote to your Team Manager?

Traffic Control Photos

Was a second person required on site for safety reasons (ZZ-1a1)?

How many hours were required (ZZ-1a1)?

Sequence Number

Type of Installation

Lead-in construction

Lead-in construction type

Underground Lead-in Details
Lead-In Length

Your Lead-in Length has exceeded 40m please ensure RG11 is installed.

Cable Type

What type of Lead-in was required on site?

Lead-in Area Before
Lead-in Work During
Lead-in After
Total distance of conduit installed?

Was Lead-in over 40m?

Extra distance of Hauling over 40m (DD-5a7) per metre

Was there more than 20m of Trenching in OTR inside the customers property?

Extra distance over 20m (MM-6b1) per metre

Was there more than 2 metres of trenching in OTR required from the property boundary to the Network pit?

Extra distance over 2m (MM-6b2) per metre

Was there any Non-Trenching Methods used?

Was there any Rock

How many metres of Trenching in rock (FF-9c1) per m
Rock Photos

Sequence Number

Sequence Number

Groundomat Photo
Groundomat Distance Photo
How many metres of Groundomat in OTR (FF-12f1)

Establishment Charge (FF-12g2)

Sequence Number

Boring Photo
Boring Distance Photo
How many metres of Boring in OTR (FF-12a2)

Establishment Charge (FF-12g1)

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Did you provide a conduit entry into an Asbestos pit (FF-4c)

Asbestos Photos

Was a pit required to be installed over existing conduit (FF-2b1)?

Sequence Number

Was P50 trenching required on site?

Sequence Number

How many metres of P50 trenching was required on site (FF-9a1)?

Was a new pit required to be installed (FF-1b1)?

Was There Any Blockages?

Type of Blockage
How many Buried Pits located (FF-15)?
Buried Pit before
Buried Pit After
How Many High Pressure Flushes (EE-14f)?
Spit water flush photo
How Many Low Pressure Flushes (EE-14g)?
Low pressure flush photo
How many Network blockages fixed (EE-14a1)?
Blockage Before
Blockage Repaired
Blockage Area After

Sequence Number

Was there any E/O

E/O Length EE14c1

Extra Length per metre (EE-14c1)
Additional length photo

E/O Depth EE14E1

Extra Depth per 500mm (EE-14e1)
Additional depth photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Was Lead-in over 40m?

Extra distance of Hauling over 40m (DD-5a7) per metre

Was There Any Blockages?

Type of Blockage
How many Buried Pits located (FF-15)?
Buried Pit before
Buried Pit After
How Many High Pressure Flushes (EE-14f)?
Spit water flush photo
How Many Low Pressure Flushed (EE-14g)?
Low pressure photo
How Many (MM-8a1)?

Sequence Number

Blockage Before Photo
Blockage Repair Photo
Blockage Area After Photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)
How Many Y Joiners installed (MM-8a2)?

Sequence Number

Before Photo
Y Joiner Installed
Area After Photo

Was there additional metres above 2m required as part of a LIC extension (MM-6b1)?

How many metres above 2m were required (MM-6b1)?

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)
How many Network blockages fixed (EE-14a1)?

Sequence Number

Blockage Before
Blockage Repaired
Blockage Area After

Was there any E/O

E/O Length EE14c1

Extra Length per metre (EE-14c1)
Additional length photo

E/O Depth EE14E1

Extra Depth per 500mm (EE-14e1)
Additional depth photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)
PCD Testing and Final Photos

PCD installed

After photo open

PCD installed in an accessible area

PCD Strength Photo

High Frequency 743 MHz PCD Reading

Aerial Lead-In Details
Lead-In Length

Your Lead-in Length has exceeded 40m please ensure RG11 is installed.

Cable Type

Lead-In Photo

Was Additional Span Required

Was there E/O installation of new coaxial drop in-span required (HFC-9a2)?

In-span coaxial drop Photo

Was there E/O for additional spans of aerial drop HFC-9a3?

How Many additional spans were required (HFC-9a3)
Additional Span Photos

New House Riser Installed?

Riser Type Installed?

Fascia Riser Photo

New Pole Riser Installed? (CC-2c2)

Was drop cable installed through existing riser (DD-5a9)

Riser Photo

Was there more than 2m of Trenching FF9a1

Additional m over 2m (FF-9a1)

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Did you provide a conduit entry into an Asbestos pit (FF-4c)

Asbestos Photos

Bandit Strapping CC2f each band

Bandit Strapping Photos
How many bandit straps installed (CC-2f)?

Was There Any Blockages?

Type of Blockage
How many Buried Pits located (FF-15)?
Buried Pit before
Buried Pit After
How Many High Pressure Flushes (EE-14f)?
Spit water flush photo
How Many Low Pressure Flushes (EE-14g)?
Low pressure flush photo
How many Network blockages fixed (EE-14a1)?

Sequence Number

Blockage Before
Blockage Repaired
Blockage Area After

Was there any E/O

E/O Length EE14c1

Extra Length per metre (EE-14c1)
Additional length photo

E/O Depth EE14E1

Extra Depth per 500mm (EE-14e1)
Additional depth photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)
PCD Testing and Final Photos

PCD installed

After photo open

PCD installed in an accessible area

PCD Strength Photo

High Frequency 743 MHz PCD Reading

Lead-in construction

Lead-in construction type

Underground Lead-in Details
Lead-In Length

Your Lead-in Length has exceeded 40m please ensure RG11 is installed.

Cable Type

What type of Lead-in was required on site?

Lead-in Area Before
Lead-in Work During
Lead-in After
Total distance of conduit installed?

Was Lead-in over 40m?

Extra distance of Hauling over 40m (DD-5a7) per metre

Was there more than 20m of Trenching in OTR inside the customers property?

Extra distance over 20m (MM-6b1) per meter

Was there more than 2 metres of trenching in OTR required from the property boundary to the Network pit?

Extra distance over 2m (MM-6b2) per metre

Was there any Non-Trenching Methods used?

Was there any Rock

How many metres of Trenching in rock (FF-9c1) per m
Rock Photos

Sequence Number

Sequence Number

Groundomat Photo
Groundomat Distance Photo
How many metres of Groundomat in OTR (FF-12f1)

Establishment Charge (FF-12g2)

Sequence Number

Boring Photo
Boring Distance Photo
How many metres of Boring in OTR (FF-12a2)

Establishment Charge (FF-12g1)

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Did you provide a conduit entry into an Asbestos pit (FF-4c)

Asbestos Photos

Was a pit required to be installed over existing conduit (FF-2b1)?

Sequence Number

Was P50 trenching required on site?

Sequence Number

How many metres of P50 trenching was required on site (FF-9a1)?

Was a new pit required to be installed (FF-1b1)?

Was There Any Blockages?

Type of Blockage
How many Buried Pits located (FF-15)?
Buried Pit before
Buried Pit After
How Many High Pressure Flushes (EE-14f)?
Spit water flush photo
How Many Low Pressure Flushes (EE-14g)?
Low pressure flush photo

Sequence Number

How many Network blockages fixed (EE-14a1)?
Blockage Before
Blockage Repaired
Blockage Area After

Was there any E/O

E/O Length EE14c1

Extra Length per metre (EE-14c1)
Additional length photo

E/O Depth EE14E1

Extra Depth per 500mm (EE-14e1)
Additional depth photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Was Lead-in over 40m?

Extra distance of Hauling over 40m (DD-5a7) per metre

Was There Any Blockages?

Type of Blockage
How many Buried Pits located (FF-15)?
Buried Pit before
Buried Pit After
How Many High Pressure Flushes (EE-14f)?
Spit water flush photo
How Many Low Pressure Flushed (EE-14g)?
Low pressure photo

Sequence Number

How Many (MM-8a1)?
Blockage Before Photo
Blockage Repair Photo
Blockage Area After Photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Sequence Number

How Many Y Joiners installed (MM-8a2)?
Before Photo
Y Joiner Installed
Area After Photo

Was there additional metres above 2m required as part of a LIC extension (MM-6b1)?

How many metres above 2m were required (MM-6b1)?

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Sequence Number

How many Network blockages fixed (EE-14a1)?
Blockage Before
Blockage Repaired
Blockage Area After

Was there any E/O

E/O Length EE14c1

Extra Length per metre (EE-14c1)
Additional length photo

E/O Depth EE14E1

Extra Depth per 500mm (EE-14e1)
Additional depth photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)
PCD Testing and Final Photos

PCD installed

After photo open

PCD installed in an accessible area

Aerial Lead-In Details
Lead-In Length

Your Lead-in Length has exceeded 40m please ensure RG11 is installed.

Cable Type

Lead-In Photo

Was Additional Span Required

Was there E/O installation of new coaxial drop in-span required (HFC-9a2)?

In-span coaxial drop Photo

Was there E/O for additional spans of aerial drop HFC-9a3?

How Many additional spans were required (HFC-9a3)
Additional Span Photos

New House Riser Installed?

Riser Type Installed?

Fascia Riser Photo

New Pole Riser Installed? (CC-2c2)

Was drop cable installed through existing riser (DD-5a9)

Riser Photo

Was there more than 2m of Trenching FF9a1

Additional m over 2m (FF-9a1)

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)

Did you provide a conduit entry into an Asbestos pit (FF-4c)

Asbestos Photos

Bandit Strapping CC2f each band

Bandit Strapping Photos
How many bandit straps installed (CC-2f)?

Was There Any Blockages?

Type of Blockage
How many Buried Pits located (FF-15)?
Buried Pit before
Buried Pit After
How Many High Pressure Flushes (EE-14f)?
Spit water flush photo
How Many Low Pressure Flushes (EE-14g)?
Low pressure flush photo
How many Network blockages fixed (EE-14a1)?
Blockage Before
Blockage Repaired
Blockage Area After

Was there any E/O

E/O Length EE14c1

Extra Length per metre (EE-14c1)
Additional length photo

E/O Depth EE14E1

Extra Depth per 500mm (EE-14e1)
Additional depth photo

Was there any Breakout & Reinstatement

Breakout Details
Breakout photos
Breakout Qty per square metre (FF-18a)
Breakout photos
Breakout Qty per square metre (FF-18b)
Breakout photos
Breakout Qty per square metre (FF-18c)
Reinstatement Types
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19a1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19a3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19c1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19c3)
Reinstatement Detail
Reinstatement photos
Reinstatement Qty per square metre (FF-19d1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19d2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19e1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19e2)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19f1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19f3)
Reinstatement Details
Reinstatement photos
Reinstatement Qty per square metre (FF-19b1)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b2)
Reinstatement photos
Reinstatement Qty per square metre (FF-19b3)
PCD Testing and Final Photos

PCD installed

After photo open

PCD installed in an accessible area

QA Check

Was a JSEA completed and signed

Is the PCD 150mm clear of all structures

Is the RF signal within Spec

Has the site been left clean and tidy

All work has been completed

Add signature