Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
Site Photos
-
MANDATORY- STREET VIEW
-
MANDATORY - SIDE VIEW
-
MANDATORY -.SITE ENTRY
-
OPTIONAL - Provide additional photos of property or damage identified in work area
List Of EUPS
-
Add Mailbox Photo (if available)
-
MANDATORY - Provide photos of all identified EUP's onsite
-
MANDATORY - Specify amount of EUP's
-
MANDATORY -Are there any essential services
-
Provide images of essential services
Connection Details
Connection Pit ( PIT 1)
-
MANDATORY -Provide pictures of Connection Pit (landscape, pit overview and network link if applicable)
-
MANDATORY -Specify Pit Type
-
MANDATORY-Specify Pit Location
-
MANDATORY - Provide Pit Address
-
MANDATORY - Connection Device
-
MANDATORY -Specify Connection Device
- 2 Port Tap
- 4 Port Tap
- 8 Port Tap
- 2 way Splitter DC 4
- 2 way Splitter 488
- 2 way splitter 777
- DC 8
- DC 12
- Amplifier
- Other
-
MANDATORY - Device Attenuation
-
Network link size (if applicable)
-
MANDATORY -Is LIC located in another pit?
PIT 2 INFORMATION
-
MANDATORY- Provide photos of Pit 2 (landscape and Network)
-
MANDATORY -Specify Pit Type
-
MANDATORY - Specify Pit Location
-
MANDATORY- Provide Pit Address
-
Network link size (if applicable)
-
Is LIC located in another pit?
PIT 3 INFORMATION
-
MANDATORY- Provide photos of Pit 3 (landscape and Network)
-
MANDATORY -Specify Pit Type
-
MANDATORY - Specify Pit Location
-
MANDATORY- Provide Pit Address
-
Network link size (if applicable)
-
Is LIC located in another pit?
PIT 4 INFORMATION
-
MANDATORY- Provide photos of Pit 4 (landscape and Network)
-
MANDATORY -Specify Pit Type
-
MANDATORY - Specify Pit Location
-
MANDATORY- Provide Pit Address
-
Network link size (if applicable)
-
Is LIC located in another pit?
PIT 5 INFORMATION
-
MANDATORY- Provide photos of Pit 5 (landscape and Network)
-
MANDATORY -Specify Pit Type
-
MANDATORY - Specify Pit Location
-
MANDATORY- Provide Pit Address
-
Network link size (if applicable)
-
Is LIC located in another pit?
-
Provide additional pit pictures below in sequence and make notes on schematics...
-
Additional Pit Pictures in sequence
LEADIN DETAILS
-
MANDATORY- Provide photos of LIC.
-
Is LIC to capacity?
-
MANDATORY- Provide LIC conduit size.
HFC Readiness
-
Is property HFC ready?
-
Pictures of existing comms
-
specify tap information
-
Specify units connected
-
Are all Laterals run?
-
Specify units with no laterals run
-
Provide detailed scope for running laterals to these units
-
Provide photos (if req) to refernce information in scope
-
If No, proceed to New Build
New Build
-
This section will identify all requirements for a new MDU build.
-
Specify scope for new build
-
Provide phptos as required for new build
Civil Works( if req)
-
Are any civil works required?
-
Specify civil works required?
-
Add photos to referenced information provided above
Additional Info
Additional information. Not covered in standard build
-
Aditional information
-
Additional photos
Hauling
-
Was any hauling undertaken?
-
Specify metres hauled?
schematics
-
Have schematics with all identifiers been uploaded
-
Sign off and submit survey