Information

  • Audit Title

  • Milepost / DOT No.

  • Conducted on

  • Prepared by

  • Location
  • Personnel

ACTIVATION FAILURE REPORT

  • 1. Inspector Name

  • 2. Inspector No.

  • 3. Region

  • 4. AF No.

  • 5. CCM No.

  • 6. 96 Report No.

  • 7. Report Date

INVESTIGATION

  • 8. FRA Informal Investigation

  • 9. FRA Formal Investigation

  • 10. Invalid Report

  • 11. Accident Occurred

  • 12. Accident Investigated

  • 13. Violation (Check if a violation is recommended)

  • 14. FRA Investigation Date

  • 15. FRA Accident No.

  • 16. Violation No.

  • 17. Railroad 6180.57 No.

  • 18. Railroad Name

  • 19. Railroad Code

GRADE CROSSING

  • 20. DOT Crossing Number

  • 21. Milepost

  • 22. City

  • 23. State

  • 24. County

  • 25. Subdivision

  • 26. Division

  • 27. Train Direction

  • 28. Controlled BY

  • 29. No. Of Tracks

  • 30. Quiet Zone

RAILROAD TEST / INSPECTION

  • 31. Monthly

  • 32. Quarterly

  • 33. Annual

  • 34. Relay

  • 35. Insulation Resistance Test

METHOD(S) OF OPERATION

  • 36. Method of Operation

SIGNAL AND SURFACE DETAILS

  • 37. Train Detection Type

  • 37a. If "Other" Train Detection Type in Box 37

  • 38. Failed Component

  • 39. MAX Authorized Highway Speed (MPH)

  • 40. Speed in Area of Crossing

  • 41. Intersecting Angle

  • 42. No. Of Highway Lanes

  • 43. Divided Hwy

  • 44. Crossing Surface

  • 45. Side Lights

  • 46. Four Quadrant Gates

  • 47. Gates

  • 48. Flashing Lights

  • 49. Bell

  • 50. Hwy Preemption

  • 51. Wig Wag

  • 52. Traffic Signal Only

  • 53. Cantilevers

  • 54. Interconnected With Another Railroad

  • 55. Other

  • 55a. If "Other" Warning Device

CAUSE AND REPAIR

  • 56. Railroad Reported Cause

  • 57. FRA Official Cause

  • 58. Date 6180.83 Signed by Railroad

  • 59. Failure Date

  • 60. Failure Time

  • 60a. Time Zone

  • 61. Repair Date

  • 62. Repair Time

  • 62a. Time Zone

INVOLVED TRAIN INFORMATION

  • 63. Train Symbol

  • 64. Train Type

  • 64a. If "Other" Train type

  • 65. Passenger Equipment

  • 65a. If "Other" Passenger Equipment

  • 66. Involved Train Speed (MPH)

  • 67. Loads

  • 68. Empties

  • 69. No. of cars

  • 70. Length

ADDITIONAL DETAILS

  • 71. Synopsis

  • 72. Describe the Circumstances on How the AF was Reported and the Railroad's Action

  • 73. Description of the Failure and Description of the Cause of Repair

  • 74. FRA Action Taken

  • 75. Other Applicable Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.