Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Do you have a sealed drawing for this pour?
-
Is shoring installed the same as the sealed drawing?
-
Is shoring visually plumb?
-
Is the column hung jack base in the location according to drawing?
-
Does screwjack extension meet the sealed drawing requirements?
-
Are spans by the sealed drawing?
-
Is the stringer still used the same as shown on drawing?
-
Is joist spacing by the drawing?
-
Are the joists used the same on the drawing?
-
Are two (2) 1-1/4" dia threaded rod w hex nuts and washers connecting the jack base to column?
-
Are all threaded rods w nuts and washers tightened to snug fit?
-
Are all pins of the Transverse Truss in place?
-
Are all clamps connection joist to truss properly installed and in place?
-
Are all pins of the Castellite Beam in place?
-
Are all lifting brackets of the Castellite Beam in place?
-
Is the connection between Transverse Beam and Castellite Beam as shown on drawing?
-
Columns reached 100% of specified 28 day strength?