Inspection Checklist
Applicable Permits:
-
JSA / SJA Completed with Contractor with Contractor Sign-In Sheet?
General Site Inspection:
-
Authorized Personnel Sign Posted at entrance of site?
-
Rig signage erected at entrance to the site and at all directional changes in route to the site?
-
Proper PPE Signage posted at entrance?
-
Visitor Signage (directing them to Toolpusher) upon entry to location?
-
Sign-In Sheet (required upon arrival) is Available?
-
No Smoking Signs and Designated Smoking Areas Signs posted?
-
Muster area Designated?
-
Is a Clean and Sanitary Portable Restroom Facility provided in close proximity to the location?
-
Change House Clean and Orderly?
-
Hazardous Locations Identified?
-
All Vessels Labeled as to their Contents?
-
Adequate Lighting Provided?
-
There are No Trip Hazards?
-
Proper PPE/FRC being worn by all personnel on Location?
-
Erected Windsock Visable?
-
OSHA Poster Posted?
-
Safety Equipment Available on Location?
-
Fall Protection being utilized when Required?
-
First Aid Kit and Blood Born Pathogen Kit available on Location?
-
Emergency Phone Posted on Location?
Stairs / Ladders / Handrails / Gaurdrails:
-
Adequate Stairs provided off Rig Floor?
-
All stairs on Location are Level?
-
Are there a minimum of 2 Stairways available to Rig Floor?
-
Are the Stairs on Location Secured?
-
There are No Trip Hazards on Stairs?
-
Stairs have Non-Skid Steps and are uniform size?
-
Adequate Handrails provided on stairs with 4 or more Risers?
-
Guardrails, Mid-Rails, and Toe-Boards Installed along all open side edges of Floors, Platforms, Etc...
-
Ladders on Location are Extended No More than 3.5ft above Platform?
-
All Fixed and Portable Ladders are in Good Condition and Free of Defects?
Rig Floor:
-
Rig Floor in Good Woking Condition?
-
All Unused Floor Holes Covered?
-
Weight Indicator Installed and Visible to Driller?
-
Driller's Controls Properly Labeled?
-
Air-Hoist Cable in Good Working Condition?
-
All Straps and Slings in Good Working Condition?
-
Housekeeping on Rig Floor is Adequate?
-
Eye Wash Station Provided?
-
Keepers and Pins Properly Installed?
Fuel / Storage Tanks:
-
Fuel Storage Tanks Properly Located and Labeled as to their Contents?
-
Discharge Valves, Nozzles and Hoses in Good Working Condition?
-
"Flammable" Warning Signs Properly Posted on All Sides of Storage Tanks?
-
LPG Storage Tanks and Compress Gas Cylinders are Properly Labeled and in Good Working Condiition?
-
Safety Caps / Bull Plugs are Properly Installed to Prevent Spills?
Fire Protection:
-
All Fire Extinguishers (B&C Class) are Properly Charged and in Good Working Condition?
-
All Fire Extinguishers (B&C Class) Have had their Monthly/Annual Inspection and Properly Tagged?
-
Flare Area is Clear of any Combustable Material?
-
Employees Have been Properly Trained to Operate Fire Extinguishers on Location?
Mud Pump Area:
-
All Drive Belts and Shafts have Guards Properly Installed?
-
All Rotating Parts have Guards Properly Installed?
-
Have Shear Pin Pop-Off Valves been Properly Covered?
-
Have Vibrator Hoses and High Pressure Lines been Properly Secured?
-
Have High Pressure Fittings been Used where Applicalbe?
-
Have All Discharge Lines from Relief Valves been Properly Anchored?
-
Are All Pumps, Pipes, Hoses, Valves, and Fittings have been Well Maintained and Are In Good Working Condition?
-
Are All Pumps, Pipes, Hoses, Valves and Fittings Being Operated at Pressures In Which they are Rated?
Blow Out Preventer / Accumulator / Choke Area:
-
Has the Blow Out Preventer (BOP) been tested to Function Properly?
-
Is the Blow Out Preventer (BOP) Properly Stabilzed?
-
Are All Hydraulic Lines Properly Connected?
-
Are All Unused Hydraulic LInes Capped and Properly Secured?
-
Has there been a Check Valve Installed On Kill LIne Side?
-
Have Safety Cables been Installed On the Kill Line and Choke Line?
-
Have Pollution Pans been Properly Installed?
-
Accumulator Vales have been Properly Identified as to their Purpose and Position?
-
All Gauges are Installed Properly and Located in the Correct Position?
-
Accumulator Bottles Properly Labeled with their Contents?
-
Are the Accumulator Operational Warning Signs Visible?
-
Is the Choke Manifold Accessible?
-
Are the Choke Manifold Gauges Visible and Working Properly?
Pipe Rack Area:
-
Are the Ends of the Pipe Racks Properly Chocked?
-
Are Spacers being Utilized to Separate Layers of Pipe?
-
Are Pipe Racks Stable / Level and In Good Working Condition?
Material Handling Equipment:
-
Has the Forklift Operator been Certified and Properly Trained?
-
Are all Equipment Certification Documents Available for Inspection on Location?
-
Is the Proper Type of Equipment being Utilized for Handling of Material on Location?
-
Is Proper Inspection of Equipment (Forklift) Being Done Prior to Daily Use?
-
All Safety Devices on Equipment (Seat-belts, BackUp Alarms, Etc.) In Good Working Condition?
Additional Findings:
Additional Findings / Issues or Concerns:
-
Issue #1:
-
Add media
-
Issue #2:
-
Add media
-
Issue #3:
-
Add media
-
Issue #4:
-
Add media
-
Issue #5:
-
Add media
-
Issue #6:
-
Add media
-
Issue #7:
-
Add media
-
Issue #8:
-
Add media
-
Issue #9:
-
Add media
-
Issue #10:
-
Add media
Approval:
-
Hilcorp Safety Specialist:
-
Company Man:
-
Tool Pusher:
-
Other (Contractor):