Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Date and Time of Inspection
-
Site Location
Site Staging Information
Surface
-
Is there a parking garage under or around staging area?
-
Are there any services underground such as GAS, WATER, SEWER, ELECTRICAL?
-
Ground Assessment
-
Condition of Ground
-
Describe what needs to be done to set crane up
-
Composition of Ground
-
Should more blocking or Plates be sent?
-
Are there Hydro Lines?
-
Do they impede setup?
-
There will be a dedicated signalman for the wires?
-
Do they impede hoisting operations
-
There will be a dedicated signalman for the wires?
-
Can crane swing or boom into Hydro lines?
-
There will be a dedicated signalman for the wires?
-
Fully Describe:
Air
-
Are there trees,poles,lights,buildings or any other encumbrances<br>WITHIN the lifting area?
-
Do they impede setup
-
Do they impede Hoisting Operations
-
Fully Describe:
-
Additional Details on Staging area
Lift Items
-
What is being hoisted
- Air Unit(s)
- Trusses
- Cement
- Gravel
- Steel
- Misc Materials
-
Describe what is being hoisted, dimensions and weight
-
Special Equipment?
- Spreader Bar
- Cement Bucket
- Hoisting Platform LIGHT
- Hoisting Platform HEAVY
- CentrePost
- Fixed Basket
-
Describe Special Equipment
-
describe how many lift points and location
Hoist & Crane Configuration
-
Crane Required/Price 1
-
Crane Required/Price 2
-
Other
-
Other Items
-
Detailed Configuration
-
Crane Configuration
- 35t FLY 104'
- 35t JIB 113'
- 35t FLY & JIB 136'
- 65t FLY 114'
- 65t FLY & JIB 146'
- 700E 1st JIB 33'
- 700E Both JIBS 56'
- 110t 1st JIB 37'
- 110t Both JIBS 66'
- 1120 1st JIB 37'
- 1120 Both JIBS 69'
- 1120 INSERT 92'
-
Offset
-
Structure Details
-
How FAR From Lift (feet), How High UP, How Far IN?
-
Additional Information?
Pricing
-
Crane Required
-
Crane Required/Price 1
-
Crane Required/Price 2
-
Mobilization Costs for Additional Equipment
-
Deliveries
-
Items to deliver
-
Other
-
Other Items
-
Permits, Lights
-
Personel
-
Rigger
-
Price for Rigger
-
Traffic Control Person (TCP)
-
Price for Traffic Control Person
-
Signalman
-
Price for Signalman
-
Encroachment Permit
-
Show Placement of Equipment
-
Price of Permit
-
Lights, Flashers, Beacons
-
What is needed? Price.
Pre-Lift Safety Plan
-
Pre-Lift Safety Plan
-
Lift Diagram
-
Lift Diagram
-
What percentage of Load Chart does this lift represent?
-
Operator's Name
- Winsor, GRANT
- Bertrand, DANNY
- Toonders, DARYL
- Tasse, MARTIN
- Gauthier, PIERRE
- Gravelle, MARC
- Landreville, PATRICK
-
Operator has Mobile Crane Operator (Branch 1) Certification and has it on his person?
-
Operator has WHMS and has it on his person?
-
Operator has FALL ARREST and has it on his person?
-
Operator/Supervisor have performed pre-lift meeting?
-
Will Personel be hoisted?
-
All persons being hoisted will have, but not limited to, PPE such as<br>SAFETY LINES, ROPE GRABS, LANYARDS AND HARNESSESS
-
Operator will have current log book for personel basket INCLUDING reduced operating charts?
-
Ministry of Labour has been advised about proposed lift?
-
Radio Communication being used between personel in basket and crane operator?
-
Hazard Assesment
-
Choose Hazard(s)
- Hydro Lines
- Pedstrians
- Other Workers
- Building ingress/regress Points
- Vehicular Traffic
- Obstructions
- EMS access, Fire Hydrants
- Oil Spill Communication
-
Describe Hazard and Procedures
-
Assessment Copy sent to Contractor?
Forms Attached
-
Form 1000
-
FORM 1000
-
WSIB
-
WSIB
-
Certificate of Insurance
-
Certificate of Insurance
Sign Off
-
Sign Off: Supervisor
-
Sign Off: Operator