Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Date and Time of Inspection

  • Site Location

Site Staging Information

Surface

  • Is there a parking garage under or around staging area?

  • Are there any services underground such as GAS, WATER, SEWER, ELECTRICAL?

  • Ground Assessment

  • Condition of Ground

  • Describe what needs to be done to set crane up

  • Composition of Ground

  • Should more blocking or Plates be sent?

  • Are there Hydro Lines?

  • Do they impede setup?

  • There will be a dedicated signalman for the wires?

  • Do they impede hoisting operations

  • There will be a dedicated signalman for the wires?

  • Can crane swing or boom into Hydro lines?

  • There will be a dedicated signalman for the wires?

  • Fully Describe:

Air

  • Are there trees,poles,lights,buildings or any other encumbrances<br>WITHIN the lifting area?

  • Do they impede setup

  • Do they impede Hoisting Operations

  • Fully Describe:

  • Additional Details on Staging area

Lift Items

  • What is being hoisted

  • Describe what is being hoisted, dimensions and weight

  • Special Equipment?

  • Describe Special Equipment

  • describe how many lift points and location

Hoist & Crane Configuration

  • Crane Required/Price 1

  • Crane Required/Price 2

  • Other

  • Other Items

  • Detailed Configuration

  • Crane Configuration

  • Offset

  • Structure Details

  • How FAR From Lift (feet), How High UP, How Far IN?

  • Additional Information?

Pricing

  • Crane Required

  • Crane Required/Price 1

  • Crane Required/Price 2

  • Mobilization Costs for Additional Equipment

  • Deliveries

  • Items to deliver

  • Other

  • Other Items

  • Permits, Lights

  • Personel

  • Rigger

  • Price for Rigger

  • Traffic Control Person (TCP)

  • Price for Traffic Control Person

  • Signalman

  • Price for Signalman

  • Encroachment Permit

  • Show Placement of Equipment

  • Price of Permit

  • Lights, Flashers, Beacons

  • What is needed? Price.

Pre-Lift Safety Plan

  • Pre-Lift Safety Plan

  • Lift Diagram

  • Lift Diagram

  • What percentage of Load Chart does this lift represent?

  • Operator's Name

  • Operator has Mobile Crane Operator (Branch 1) Certification and has it on his person?

  • Operator has WHMS and has it on his person?

  • Operator has FALL ARREST and has it on his person?

  • Operator/Supervisor have performed pre-lift meeting?

  • Will Personel be hoisted?

  • All persons being hoisted will have, but not limited to, PPE such as<br>SAFETY LINES, ROPE GRABS, LANYARDS AND HARNESSESS

  • Operator will have current log book for personel basket INCLUDING reduced operating charts?

  • Ministry of Labour has been advised about proposed lift?

  • Radio Communication being used between personel in basket and crane operator?

  • Hazard Assesment

  • Choose Hazard(s)

  • Describe Hazard and Procedures

  • Assessment Copy sent to Contractor?

Forms Attached

  • Form 1000

  • FORM 1000

  • WSIB

  • WSIB

  • Certificate of Insurance

  • Certificate of Insurance

Sign Off

  • Sign Off: Supervisor

  • Sign Off: Operator

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.